|
|
 |
- Abbott, D.G., 1996. "The Utilization of Microtunneling
to Install Underground Pipes and Tunnels in Hard Rock," North
American Tunneling '96, A.A. Balkema, April, Volume 1, pp. 3-9.
- Abramson, L.W., M.E. Fowler, and G.M. Boyce, 1996. "Santa
Cruz Landfill Water Bypass Tunnel," North American Tunneling
'96, A.A. Balkema, April, Volume 1, pp. 17-25.
- Allen, M.E., 1981. "Pipe Jacking Techniques for Small Soft
Ground Tunnels," Proceedings of Rapid Excavation and Tunneling
Conference, SME, May, pp. 289-306.
- Almeida, A.V., 1992a. "Trenchless Technology: A User Perceptive,"
Proceedings of International No-Dig '92, NASTT, April, Paper J1.
- Almeida, A.V., 1992b. "Dallas Goes Trenchless," Civil
Engineering, ASCE, September, pp. 71-73.
- Almeida, A.V. and D. Diehl, 1993. "Dallas Goes Trenchless,"
Proceedings North American No-Dig '93, NASTT, San Jose, May, Paper
J2.
- Anderson, V.W., 1990. "The Prefab Tunnel," Civil Engineering,
ASCE, January, pp. 64-65.
- Andrews, W., 1982. "Pipes Give European Tunnellers a Jack-Up,"
Tunnels & Tunnelling, January-February, pp. 20-21.
- Argent, M.E., D.A. Pecknold, and R.M. HajAli, 1995. "Trenchless
Installation of Steel Pipe Without Field Welding," Proceedings
of North American No-Dig '95, NASTT, Toronto, May, Paper 5A-1.
|
- ASCE, 1996. Pipeline Crossings, Manuals and Report on Engineering
Practice No. 89, June, 133p.
- ASTM, 1998. ASTM Standards Related to Trenchless Technology,
ASTM, December, 538p.
- Atalah, A., 1996. "Design of Microtunneling and Jacking
Pipe," Proceedings of Pipeline Crossings 1996, ASCE, June,
pp. 395-402.
- Atalah, A., 1997. "Status of the North American Microtunneling
Industry: History and Outlook," No-Dig Engineering, Trenchless
Technology, Vol. 4, No. 3, May/June, pp. 12-16.
- Atalah, A.L., D. Bennett, and D.T. Iseley, 1994. "Estimating
The Required Jacking Force," Proceedings of North American
No-Dig '94, NASTT, Dallas, April, Paper D2.
- Atalah, A. and P. Hadala, 1996a. "Microtunneling Database
for the USA and Canada," No-Dig Engineering, Trenchless Technology,
Vol. 3, No. 3, May/June, pp. 18-20.
- Atalah, A. and P. Hadala, 1996b. "Microtunneling Database
for the USA and Canada from 1984 to 1995, " Proceedings of
Pipeline Crossings 1996, ASCE, June, pp. 332-339.
- Atalah, A.L. and D.T. Iseley, 1991. "Pipe Arch Horizontal
Drift Method for MARTA's Transit Extension Under I-285,"
Proceedings of Rapid Excavation and Tunneling Conference, SME,
Chapter 24, June, pp. 435-453.
- Atkin, R. and A. Newman, 1984. "Crunchingmole Eats Gateshead
Sewer," Tunnels & Tunnelling: Small-bore Tunnelling and
Pipe Jacking Supplement, October, pp. 16-17.
|
|
|
 |
|
- Babendererde, S., 1991. "Long Distance Pipe Jacking in
Sayreville, New Jersey," Proceedings of Rapid Excavation
and Tunneling Conference, SME, Chapter 21, June, pp. 379-389.
- Balasubramaniam, B. and C. DiFrancesco, 1996. "Slurry Shield
Tunneling in siltstones and Cobble Stones: Australian Experience,"
Proceedings of International No-Dig '96, NASTT, New Orleans, April,
Paper 3A-1, pp. 250-270.
- Barbera, L.J., 1984. "Auger of a Bright Future," Tunnels
& Tunnelling: Small-bore Tunnelling and Pipe Jacking Supplement,
October, p. 39.
- Barbera, L.J., D.T. Iseley, and R. Tanwani, 1993. "Historical
Development of Trenchless Construction Methods and Equipment in
the United States," Proceedings of Trenchless Technology:
An Advanced Technical Seminar, Trenchless Technology Center, Louisiana
Tech University, January, pp. 139-159.
- Barsoom, J., 1993. "Denver's Experience in Trenchless Technology,"
Proceedings of Trenchless Technology: An Advanced Technical Seminar,
Trenchless Technology Center, Louisiana Tech University, January,
pp. 45-52.
- Bateman, G., 1998. "Monitoring Ground Movement to Control
Microtunnelling Operations," Proceedings of the 2nd Annual
Asia Tunnelling Summit, Kuala Lumpur.
- Batta, J., J. Harris, and M. Giandoni, 1998. "Appropriate
Trenchless Technologies for the Successful Completion of a Major
Interceptor Sewer Construction project, the City of San Diego¡¦s
North Mission Valley Interceptor Sewer," Proceedings of North
American No-Dig '98, NASTT, Albuquerque, April, Paper 2B1, pp.
104-110.
- Becker, C., 1992. "The Extension of the Limits of Application
of Remote Controlled Microtunnelling Machines," Microtunneling,
Balkema, Rotterdam, April, pp. 67-69.
- Becker, W., 1992. "Microtunneling Projects in Berlin and
the New German Provinces," Microtunneling, Balkema, Rotterdam,
April, pp. 59-65.
- Bennett, D., 1993. "Microtunneling Tests at WES: Construction
of Test Facility," Proceedings of North American No-Dig '93,
NASTT, San Jose, May, Paper A2.
- Bennett, D., L. Guice, S. Khan, and K. Staheli, 1995. Guidelines
for Trenchless Technology: Cured-in-Place Pipe (CIPP), Fold-and
Formed Pipe (FFP), Mini-Horizontal Directional Drilling (Mini-HDD),
and Microtunneling, U.S. Army Corps of Engineers, Final Report
CPAR-GL-95-2, September, 173p.
- Bennett, D., C. Norris, and D.T. Iseley, 1993. "Microtunneling:
Preliminary Results from Testing Performed Under the CPAR Program,"
Proceedings of Rapid Excavation and Tunneling Conference, SME,
June, pp. 109-127.
- Bennett, D. and K. Staheli, 1995. "Case Study: Retrievability
and Reaming Capabilities Tested in Third WES Microtunneling Test,"
No-Dig Engineering, Trenchless Technology, Vol. 2, No. 1, March,
pp. 8-13.
- Bennett, D. and P.A. Taylor, 1993. "Construction of Microtunneling
Test Facility at WES and Preliminary Test Results," Proceedings
of Trenchless Technology: An Advanced Technical Seminar, Trenchless
Technology Center, Louisiana Tech University, January, pp. 289-327.
- Berosch, M. and C. Angot, 1992. "Social Cost and Pipelaying:
A View of the Situation in France," Proceedings of International
No-Dig '92, NASTT, April, Paper D3.
- Beyert, J., 1992. "Trends and Prospects of Microtunneling
in the Federal Republic of Germany," Microtunneling, Balkema,
Rotterdam, April, pp. 5-7.
- Biggart, A.R., 1979. "Slurry Face Machine Tunnelling,"
Proceedings of Rapid Excavation and Tunneling Conference, SME,
June, pp. 497-520.
|
- Bloomfield, T.D., 1994. "Polymer Concrete Pipes,"
No-Dig International, Vol. 5, No. 9, October, pp. 14-16.
- Bloomfield, T.D., 1995. "Sewers and Manholes with Polymer,"
No-Dig Engineering, Trenchless Technology, Vol. 2, No. 2, Summer,
pp. 14-17.
- Boyce, G.M., 1992. "To Dig or Not to Dig - Microtunneling
Is Answer to Underground Problems," California Consulting
Engineer and Land Surveyor, Vol. 5, No. 4, Winter, pp. 12-13.
- Boyce, G.M., 1995. "Geotechnical Considerations for Microtunneling,"
Proceedings of ISDT Annual Conference, Las Vegas, April, pp. x.
- Boyce, G.M., 1997a. "Installation of a 30-Inch Diameter
Ductbank Under Runway 18/36," Proceedings of No-Dig ¡¥97,
NASTT, Seattle, April, pp. 127-137.
- Boyce, G.M., 1997b. "Incorporating Microtunnels into the
Design of Pipelines," Proceedings of Trenchless Pipeline
Projects: Practical Applications, ASCE, Boston, June, pp. 19-26.
- Boyce, G.M. and L.W. Abramson, 1993. "Microtunneling Design
Documents," Proceedings of North American No-Dig '93, NASTT,
San Jose, May, Paper B1.
- Boyce, G.M. and E.M. Bried, 1994a. "Benefit-Cost Analysis
of Microtunneling in an Urban Area," Proceedings of North
American No-Dig '94, NASTT, Dallas, April, Paper A1.
- Boyce, G.M. and E.M. Bried, 1994b. "Estimating the Social
Cost Savings of Trenchless Techniques," No-Dig Engineering,
Trenchless Technology, Vol. 1, No. 2, December, pp. 2-5.
- Boyce, G.M. and E.M. Bried, 1998. "Social Cost Accounting
for Trenchless Projects," Proceedings of North American No-Dig
'98, NASTT, Albuquerque, April, pp. 2-12.
- Boyce, G.M. and T.R. Coss, 1997. "A 10-Year Review of Microtunneling
in North America," Proceedings of the 13th Rapid Excavation
and Tunneling Conference, SME-AIME, Las Vegas, June, pp. 779-795.
- Boyce, G.M., M.L. Fong, and L.W. Abramson, 1995. "Microtunneling
& Landfills - An Ideal Combination," Proceedings of North
American No-Dig '95, NASTT, Toronto, May, Paper 5C-2.
- Boyce, G.M. and W.W.S. Gray, 1996. "A User¡¦s Guide of
Pipe," Proceedings of International No-Dig '96, NASTT, New
Orleans, April, Paper 6A-2, pp. 520-532.
- Brinton, R.K., 1990. "A Contractor's Experience in the
Development and Application of Mini-Directional Drilling,"
Proceedings of Microtunneling & Horizontal Directional Drilling
Symposium, TEC, Louisiana Tech University, November 13-15, Chapter
R.
- Bristow N., 1993. "A Variable Diameter Microtunneling System,"
Proceedings of Trenchless Technology: An Advanced Technical Seminar,
Trenchless Technology Center, Louisiana Tech University, January,
pp. 329-334.
- Bristow N., 1994. "Microtunneling Using an Upsizing Reamer,"
Proceedings of North American No-Dig '94, NASTT, Dallas, April,
Paper E1.
- Brusey, W., 1993. "Microtunneling Electrical Ductbanks
at JFK Airport," Proceedings of North American No-Dig '93,
NASTT, San Jose, May, Paper L2.
- Brusey, W., 1998. "Utility installation Under Active Operational
Facilities at Major International Airport," Proceedings of
North American No-Dig '98, NASTT, Albuquerque, April, Paper 4B2,
pp. 294-320.
- Budhu, G. and D.T. Iseley, 1994. "The Economics of Trenchless
Technology Versus the Traditional Cut and Fill in High-Activity
Urban Corridors - A Research Concept in a Real World Environment,"
Proceedings of North American No-Dig '94, NASTT, Dallas, April,
Paper A2.
|
|
|
 |
|
- Carpenter, R.R. and R. Croxton, 1995. "The Development
and Installation of Ductile Iron Microtunneling Pipe," No-Dig
Engineering, Trenchless Technology, Vol. 2, No. 3, Fall, pp. 7-12.
- Carpenter, R.R. and R.C. Conner, 1996. "Ductile Iron Microtunneling
Pipe, Non-Traditional Installation Applications," Proceedings
of Pipeline Crossings 1996, ASCE, June, pp. 312-321.
- Casey, E.F., 1974. "Objectives of UCRC Commission on Mini-Tunnels,"
Proceedings of Rapid Excavation and Tunneling Conference, SME,
June, pp. 263-264.
- CB&E Feature, 1992. "Pre-Spiling Technique Speeds Soft
Ground Tunneling," California Builder & Engineer, December
21, pp. 8-12.
- Chapman, D.N. and C.D.F. Rogers, 1996. "Understanding and
Predicting Ground Behaviour associated with Trenchless Operations,"
Proceedings of International No-Dig '96, NASTT, New Orleans, April,
Paper 6A-1, pp. 503-518.
- Cherrington, M., 1990. "The History of River Crossings
by Horizontal Directional Drilling," Proceedings of Microtunneling
& Horizontal Directional Drilling Symposium, TEC, Louisiana
Tech University, November 13-15, Chapter M.
- Clarke, I., 1991. "Mannheim By-Pass Connection," World
Tunnelling, October, pp. 315-317.
- Clarke, I., 1992. "Micro Utilisation on Green Field Development,"
No-Dig International, Vol. 3, No. 6, December, pp. 5-8.
- Clarke, I., 1993. "Leading the Way in the Americas,"
No-Dig International, Vol. 4, No. 2, April, pp. N4-N7.
- Clarke, I., 1994a "West Coast Innovation," No-Dig
America - Supplement, Vol. 5, No. 3, April, pp. 22-25.
- Clarke, I., 1994b. "Remote-Control Assists Operation Seaclean,"
No-Dig International, Vol. 5, No. 11, December, pp. 6-8.
- Clarke, I., 1994c. "New Sewers For Edmonton," No-Dig
International, Vol. 5, No. 11, December, pp. 17-19.
- Clarke, I., 1994d. "Heathrow Taxiway Crossing," No-Dig
International, Vol. 5, No. 11, December, pp. 20-22.
- Clarke, I., 1996a. "Pleasant Hill Tests New Machine Design,"
No-Dig International, Vol. 7, No. 2, February, pp. 13-14.
- Clarke, I., 1996b. "Tough Times in Thurrock," No-Dig
International, Vol. 7, No. 5, May, pp. 6-9.
- Clarke, I., 1997. "Innovative Boring for Cape Girardeau
Resewering," No-Dig America Supplement to No-Dig International,
Vol. 8, No. 4, April.
- Clarke, I., 1998a. "Long Distance Pipejacking," No-Dig
International, Vol. 9, No. 8, August, pp. 12-13.
- Clarke, I., 1998b. "Cardiff Bay Clean Up," No-Dig
International, Vol. 9, No. 9, September, pp. 29-32.
|
- Coleman, D.J., R.H. Davidson, and F. Bandoni, 1995. "Environmentally
Appropriate Methods of Sewer Construction," Proceedings of
North American No-Dig '95, NASTT, Toronto, May, Paper 5C-1.
- Coller, P.J., 1990. "The Iseki Poly-Tech Story," Proceedings
of Microtunneling & Horizontal Directional Drilling Symposium,
TEC, Louisiana Tech University, November 13-15, Chapter H.
- Coller, P.J., 1992. "Micro and Small Diameter Tunneling,"
Proceedings of International No-Dig '92, NASTT, Washington, D.C.,
April, Paper F1.
- Coller, P.J., 1993a. "Overview of Microtunneling Techniques,"
Proceedings of Trenchless Technology: An Advanced Technical Seminar,
Trenchless Technology Center, Louisiana Tech University, January,
pp. 237-247.
- Coller, P.J., 1993b. "New Developments in Muckless Microtunneling
and Installation," Proceedings of North American No-Dig '93,
NASTT, San Jose, May, Paper D2.
- Coller, P.J., K. Staheli, D. Bennett, and R. Post, 1996a. "A
Review of Jacking Forces by Both Theoretical and Empirical Methods
as Compared with 20 Years of Practical Experience," Proceedings
of International No-Dig '96, NASTT, New Orleans, April, Paper
2A-1, pp. 126-150.
- Coller, P.J., K. Staheli, D. Bennett, and R. Post, 1996b. "Review
of Jacking Forces in Theory and Practice, Part I," No-Dig
Engineering, Trenchless Technology, Vol. 3, No. 5, September/October,
pp. 17-23.
- Coller, P.J., K. Staheli, D. Bennett, and R. Post, 1996c. "Review
of Jacking forces in Theory and Practice, Part II," No-Dig
Engineering, Trenchless Technology, Vol. 3, No. 6, November/December,
pp. 16-20.
- Coluccio, F. and D.G. Abbott, 1995. "Cutting Through the
Challenges of a Long Drive," Proceedings of Rapid Excavation
and Tunneling Conference, SME, Chapter 24, June, pp. 337-381.
- Crowder, W.T., 1993. "Underwater Recovery of Microtunneling
Equipment," Proceedings of Trenchless Technology: An Advanced
Technical Seminar, Trenchless Technology Center, Louisiana Tech
University, January, pp. 391-397.
- Cruz, E., Jr., 1992. "Manholes and Microtunneling,"
Civil Engineering, ASCE, December, pp. 52-55.
- Cruz, E., 1993. "Microtunneling Under Difficult Conditions
in New York City," Proceedings of Trenchless Technology:
An Advanced Technical Seminar, Trenchless Technology Center, Louisiana
Tech University, January, pp. 383-390.
- Currie, R., C. Schumacher, and E. Thornton, 1993. "Microtunneling
Replaces Open Trench for Suspended Sewer Project," Proceedings
of North American No-Dig '93, NASTT, San Jose, May, Paper N2.
- Cusack, J.J., 1996. "Trenchless Relocations of existing
Utilities for the Central Artery/Third Harbor Tunnel Project,"
Proceedings of International No-Dig '96, NASTT, New Orleans, April,
Paper 4A-2, pp. 339-348.
|
|
|
 |
|
- Darling, P., 1992. "Brentford Sewer Relieves Underground
Water Congestion," Tunnels & Tunnelling, December, pp.
47-51.
- Darling, P., 1993a. "Jacking Fibreglass in New York,"
Tunnels & Tunnelling, April, pp. 18-20.
- Darling, P., 1993b. "Jacking Under Singapore's Busiest
Street," Pacific Rim Supplement to Tunnels & Tunnelling,
Summer, pp. 19-23.
|
- Darwin, M., 1992. "Common Trenchless Techniques,"
Tunnels & Tunnelling, June, pp. 49-50.
- Donaldson, D.R., 1992. "Two Decades of Tunnelling,"
World Tunnelling, November, pp. 431-433.
|
|
|
 |
|
- Ensor, W.D., E.P. Skipper, E.M. Plucinski, and P.S. Fortin,
1991. "Horizontal Directionally Controlled Drill Crossing
at the Elizabeth River, Southern River," Pipeline Crossings,
ASCE, March, pp. 20-33.
- Essex, R.J., 1993. "Subsurface Exploration Considerations
for Microtunneling/Pipe Jacking Projects," Proceedings of
Trenchless Technology: An Advanced Technical Seminar, Trenchless
Technology Center, Louisiana Tech University, January, pp. 275-288.
|
|
|
|
 |
|
- Federick, R., 1995a. "State of Hawaii's Deep Water Suction
Intake Tunnels by Microtunneling," Proceedings of North American
No-Dig '95, NASTT, Toronto, May, Paper 6A-1.
- Fedrick, R.M., 1995b. "State of Hawaii¡¦s Deep Water Suction
Intake Tunnels by Microtunneling," Proceedings of Rapid Excavation
and Tunneling Conference, SME, Chapter 25, June, pp. 383-392.
- Firmin, J.A. and P.J. Miller, 1990. "Horizontal Directional
Drilling: The Process and Product," Proceedings of Microtunneling
& Horizontal Directional Drilling Symposium, TEC, Louisiana
Tech University, November 13-15, Chapter S.
|
- Friant, J.E. and D.G. Abbott, 1994. "Developments in Hard
Rock Microtunneling," Proceedings of North American No-Dig
'94, NASTT, Dallas, April, Paper E2.
- Friant, J.E. and L. Ozdemir, 1994. "Development of the
High Thrust Mini-Disc Cutter for Microtunneling Applications,"
No-Dig Engineering, Trenchless Technology, Vol. 1, No. 1, June,
pp. 12-16.
- Funkhouser, M.R., W.D. Leech, and S.S. Leius, 1993. "Microtunneling
for Pre-Support of MARTA Tunnels," Proceedings of Rapid Excavation
and Tunneling Conference, SME, June, pp. 963-982.
|
|
|
 |
|
- Garrett, R., 1992. "Refined Solution at Indianapolis,"
North American Tunneling, May, pp. N27-N30.
- Garrett, R., 1995. "Method Change Eases Residents Fears,"
No-Dig International, Vol. 6, No. 5, May, pp. 12-14.
- Garrett, R., 1998. "Microtunnelling ¡V Prequalifying and
Partnering," No-Dig International, Vol. 9, No. 11, November,
pp. 11-12.
- Garrett, T., S. Savinov, and R, Lys, 1998. "The Equalizer:
A Smart Material Approach to the Steering Problem," Proceedings
of North American No-Dig '98, NASTT, Albuquerque, April, pp. 218-232.
- Genzlinger, D.D., 1995. "Teamwork Overcomes Tunneling Difficulties,"
Trenchless Technology, February, pp. 34-36.
|
- Gilman, B., 1995. "Historic Boston Offers a Real Challenge,"
Proceedings of North American No-Dig '95, NASTT, Toronto, May,
Paper 1A-1.
- Godinez, R. and K. Ensminger, 1996. "Microtunneling Versus
Conventional Pipe Jacking: The Importance of Choosing the Right
Method," Proceedings of International No-Dig '96, NASTT,
New Orleans, April, Paper 4A-1, pp. 330-337.
- Gokhale, S.B. and M.H. Bruce, 1997. "Comparison of Standards
for Microtunneling Pipes," No-Dig Engineering, Trenchless
Technology, Vol. 4, No. 3, May/June, pp. 8-10.
- Gokhale, S.B., 1998. "Microtunnelling in Indiana,"
No-Dig International, Vol. 9, No. 3, March, pp. N3-N4.
|
|
|
 |
|
- Habibian, A. and S. Law, 1995. "Wetland Crossing of a Water
Main by a Tunnel Boring Machine," No-Dig Engineering, Trenchless
Technology, Vol. 2, No. 4, Winter, pp. 17-21.
- Hair, C.W., 1990. "A Geotechnical Perspective on Trenchless
Excavation," Proceedings of Microtunneling & Horizontal
Directional Drilling Symposium, TEC, Louisiana Tech University,
November 13-15, Chapter O.
- Hair, C.W., 1991. "Analysis of Subsurface Pressures Involved
with Directionally Controlled Horizontal Drilling," Pipeline
Crossings, ASCE, March, pp. 1-12.
- Hair, C.W., 1993. "Subsurface Conditions Affecting Horizontal
Directional Drilling," Proceedings of Trenchless Technology:
An Advanced Technical Seminar, Trenchless Technology Center, Louisiana
Tech University, January, pp. 217-236.
- Hair, J.D., 1993. "Design and Project Management Considerations
Involved with Directionally Controlled Horizontal Drilling,"
Proceedings of Trenchless Technology: An Advanced Technical Seminar,
Trenchless Technology Center, Louisiana Tech University, January,
pp. 199-216.
- Halderman, R., 1989. "Weekend Job (Horizontal Directional
Drilling Case History)," World Tunnelling, August, pp. 328-329.
- Hall, G.J., 1993. "Environmental Applications of Horizontal
Wells," Proceedings of Trenchless Technology: An Advanced
Technical Seminar, Trenchless Technology Center, Louisiana Tech
University, January, pp. 353-367.
- Hamilton, J., 1998. "Cairo Clean Up Continues," No-Dig
International, Vol. 9, No. 10, October, pp. 18-19.
- Hancher, D.E., T.D. White, and D.T. Iseley, 1989. "Construction
Specifications for Highway Projects Requiring Horizontal Earth
Boring and/or Pipe Jacking Techniques," Final Report, Indiana
Department of Highways, JHRP Project No. C-36-672, File No. 9-11-26,
July.
- Hansen, D.E., R. Coon, and D. Russo, 1994. "Microtunneling
for the Installation of an Electrical Duct Bank," Proceedings
of North American No-Dig '94, NASTT, Dallas, April, Paper K1.
|
- Hansen, R. and J. Druckman, 1998. "A Case Study of the
Wilmette¡¦s Relief Sewer Program," Proceedings of North American
No-Dig '98, NASTT, Albuquerque, April, Paper 2B2, pp. 111-129.
- Hayes, N.F., 1992. "Microtunneling the Western Interceptor
Sewer - Phase V, Newcastle Upon Tyne, England," Microtunneling,
Balkema, Rotterdam, April, pp. 47-57.
- Haynes, C., H.K. Proffit, and J.T. Brown, 1995. "Transmission
Main Constructed With Microtunneling Techniques," No-Dig
Engineering, Trenchless Technology, Vol. 2, No. 2, Summer, pp.
18-23.
- Hayward, P., 1995. "Progress in Clayware," No-Dig
International, Vol. 6 No.2, February, pp. 19-20.
- Heavey, E., A.L. Larson, K. Madden, J.P. Miller, and S.C. Teel,
1994. "Microtunneling the Interurban: Solving Geotechnical
and Design Concerns with Trenchless Technology in Seattle, Washington,"
Proceedings of North American No-Dig '94, NASTT, Dallas, April,
Paper H2.
- Henry, K.L. and D. Zoumaras, 1994. "To Microtunnel or Not
to Microtunnel? The Construction of the Crown Point Trunk Sewer,"
Proceedings of Pipeline Conference, Phoenix, Arizona, June.
- Herbert, J.C. and J.C. Thomson, 1992. "Trenchless Design
for the South Coast Sewerage Scheme in Barbados," Proceedings
of International No-Dig '92, NASTT, April, Paper J2.
- Herrenknecht, M., 1996. "Europipe - 2,535 Meter Drivage,
Entering a New dimension of Pipe-Jacking Operations," Proceedings
of International No-Dig '96, NASTT, New Orleans, April, Paper
3A-2, pp. 272-277.
- Hua, C.K., 1994. "Pipejacking in Malaysia," No-Dig
International, Vol. 5, No. 10, November, pp. 6-8.
- Husselbee, B.W. and R.M. Norman, 1992. "Environmental Benefits
of Horizontally-Controlled Directional Drilling," Public
Works, December, pp. 36-37.
|
|
|
 |
|
- Ingraffea, A.R., T.D. O'Rourke, H. Stewart, A. Barry, and C.
Crossley, 1991. "Guidelines for Uncased Crossings of Highways
and Railroads," Pipeline Crossings, ASCE, March, pp. 34-46.
- Iseley, D.T., 1990. "Trenchless Excavation Construction:
Microtunneling - The United States Experience," Proceedings
of the International Symposium on Unique Underground Structures,
USBR, Vol. 2, Chapter 92, June.
- Iseley, D.T., 1991. "Microtunneling MARTA," Civil
Engineering, ASCE, December, pp. 50-53.
- Iseley, D.T. and S. Gokhale, 1997. "Transportation Research
Board (TRB) Trenchless Methods Study," Proceedings of No-Dig
¡¥97, NASTT, Seattle, April, pp. 177-194.
- Iseley, D.T. and R. Tanwani, 1990a. "Microtunneling Methods,"
Proceedings of Microtunneling & Horizontal Directional Drilling
Symposium, TEC, Louisiana Tech University, November 13-15, Chapter
K.
|
- Iseley, D.T. and R. Tanwani, 1990b. "Directionally Controlled
Methods in TEC," Proceedings of Microtunneling & Horizontal
Directional Drilling Symposium, TEC, Louisiana Tech University,
November 13-15, Chapter Z.
- Iseley, D.T. and R. Tanwani, 1990c. "Social Costs of Traditional
Methods of Utility Installation," Proceedings of Microtunneling
& Horizontal Directional Drilling Symposium, TEC, Louisiana
Tech University, November 13-15, Chapter AA.
- Iseley, D.T. and R. Tanwani, 1992. "Trenchless Excavation
Construction - Equipment and Methods Manual," Prepared for
National Utility Contractors Association, Arlington, VA, January,
65p.
|
|
|
 |
|
- Jeyapalan, J.K., 1992. "Developments in Microtunneling
Techniques for Sewer Construction," Presented at the 65th
Annual Conference of the Water Environment Federation, September.
- Jeyapalan, J.K., 1995. "Pipe-Soil Interaction Design Considerations
in Microtunneling/Jacking Projects," Proceedings of North
American No-Dig '95, NASTT, Toronto, May, Paper SA3.
|
- Jones, M.B., 1989. "Big Future for Small Bores," World
Tunnelling, April, pp. 137-154.
|
|
|
 |
|
- Kamber, P., 1992. "Microtunneling Through Scree and River
Gravels in Switzerland," Microtunneling, Balkema, Rotterdam,
April, pp. 15-17.
- Kanari, H., N. Nagata, N. Kawaguchi, and M. Shiomi, 1996. "Effect
of Stress Absorbers on Pipe Splitting During Jacking in Curves,"
Proceedings of International No-Dig '96, NASTT, New Orleans, April,
Paper 3A-3, pp. 279-289.
- Kanematsu, T. and H. Kusakawa, 1981. "Fully Mechanized
Small Diameter Tunneling Technology," Proceedings of Rapid
Excavation and Tunneling Conference, SME, May, pp. 332-341.
- Kaoru, M., C. Gang, Y. Fujio, and H. Kiyoshi, 1998. "Air
Transport of Spoil for Microtunnelling," No-Dig International,
Vol. 9, No. 8, August, p. 18.
- Kastner, R., A. Pellet, J. Ouvry, and A. Guilloux, 1996. "In-situ
Monitoring of Microtunnelling," Proceedings of International
No-Dig '96, NASTT, New Orleans, April, Paper 2A-3, pp. 171-182.
- Kawarabata, Y., 1983. "Recent Advancements in Slurry Shield
Tunneling," Proceedings of Rapid Excavation and Tunneling
Conference, SME, June, pp. 299-317.
- Kawata, H., T. Ueno, and M. Yamazaki, 1979. "Effective
New Tunneling Method Under Railways," Proceedings of Rapid
Excavation and Tunneling Conference, SME, June, pp. 430-443.
- Kawakawi, K., Y. Nojiri, T. Takatsuka, T. Kurosawa, and Y. Harada,
1992. "Microtunnelling System Employing Fuzzy Reasoning for
Directional Control," Proceedings of International No-Dig
'92, NASTT, April, Paper L2.
- Klein, S., 1991. "Geotechnical Aspects of Pipe Jacking
Projects," Proceedings of Pipeline Crossings, ASCE, March,
pp. 113-128.
|
- Klein, S., 1993. "Planning and Design Considerations for
Microtunneling/Pipe Jacking Projects," Proceedings of Trenchless
Technology: An Advanced Technical Seminar, Trenchless Technology
Center, Louisiana Tech University, January, pp. 260-273.
- Klein, S.J., 1995. "Design Aspects of Microtunneling Projects,"
No-Dig Engineering, Trenchless Technology, Vol. 2, No. 2, Summer,
pp. 9-12.
- Klein, S., G.S. Nagle, G.L. Raines, 1996. "Important Geotechnical
Considerations for Microtunneling," No-Dig Engineering, Trenchless
Technology, Vol. 3, No. 4, July/August, pp. 9-12.
- Klein, S.J., G.S. Nagle, M. Watson, and V.F. Scotti, 1997. "Evaluation
of Trenchless Construction Methods for Bradshaw Interceptor Section
5A," Proceedings of No-Dig ¡¥97, NASTT, Seattle, April, pp.
313-331.
- Kosowatz, J.J., 1992. "Microtunneling Forges Ahead,"
Engineering News Record, August 17, pp. 32-36.
- Kramer, S.R. and W.J. McDonald, 1991. "Applications for
Small-Diameter Horizontal Boring Equipment," Pipeline Crossings,
ASCE, March, pp. 296-305.
- Kramer, S.R., W.J. McDonald, and J.C. Thomson, 1992. An Introduction
to Trenchless Technology, Van Nostrand Reinhold, New York, 223p.
- Krzys, B.P., 1990. "American Soltau: A Worldwide Microtunneling
Solution for North America," Proceedings of Microtunneling
& Horizontal Directional Drilling Symposium, TEC, Louisiana
Tech University, November 13-15, Chapter F.
- Kuroiwa, M., T. Saitoh, and S. Sugimoto, 1992. "Development
of a Shallow Seismic Reflection Survey for Microtunneling Method,"
Proceedings of International No-Dig '92, NASTT, April, Paper C2.
|
|
|
 |
|
- LaFaso, E., 1996. "Long-Distance Microtunneling for Gas
Mains," No-Dig International, Vol. 7, No. 7, July, pp. 16-18.
- Lamb, E., R. Lys and T.M. Garrett, 1993. "Specifying Microtunneling
Jobs," Proceedings of Trenchless Technology: An Advanced
Technical Seminar, Trenchless Technology Center, Louisiana Tech
University, January, pp. 457-466.
- Lees, H., 1993. "Microtunneling in the North West,"
No-Dig International, Vol. 4, No. 5, October, pp. 14-15.
|
- Lemcke, U., 1991. "Shallow MARTA Transit Tunnels Under
I-285 Utilizing Microtunneling, Horizontal Jet-Grouting and Pipe
Piling," APTA Rapid Transit Conference, June, 29p.
- Lemcke, U., 1992. "MARTA's Shallow Tunnels Under I-285;
A Post-Construction Evaluation," APTA Rapid Transit Conference,
June, 29p.
- Lovet, R., 1981. "Excavation Equipment for Small Soft Ground
Tunnels," Proceedings of Rapid Excavation and Tunneling Conference,
SME, May, pp. 285-288.
|
|
|
 |
|
- Malcolm, S.R. and K.M. Brown, 1996. "Reinforced Concrete
Pipe for Jacking and Microtunneling," No-Dig Engineering,
Trenchless Technology, Vol. 3, No. 2, March-April, pp. 11-16.
- Mathy, D. and T. Pilecki, 1997. "Planning and Design Considerations
for Microtunneling," Proceedings of No-Dig ¡¥97, NASTT, Seattle,
April, pp. 371-390.
- Marshall, M.A. and G.W.E. Milligan, 1996. "A Case Study
of an Instrumented Microtunnel in fine Sand," Proceedings
of International No-Dig '96, NASTT, New Orleans, April, Paper
2A-2, pp. 152-169.
- Matsushita, H., 1979. "Earth Pressure Balanced Shield Method,"
Proceedings of Rapid Excavation and Tunneling Conference, SME,
June, pp. 521-529.
- McArthur, T.L. and T.D. Sanders, 1993. "Sewer Tunnels Under
Surface Obstacles," Public Works, March, pp. 72-74.
- McBean, R., 1989. "Turning the Eye," World Tunnelling,
August, pp. 325-327.
- McKelvie, S.A., 1991. "Roadblocks to Microtunneling - The
Canadian Experience," Proceedings of North America No-Dig
'91, NASTT, May, Paper 4B.
- McKelvie, S.A., 1994. "Selecting Microtunneling Pipe in
Hartford," Proceedings of North American No-Dig '94, NASTT,
Dallas, April, Paper H1.
- McKenney, F.S., 1990. "Hard Rock Directional Crossings
Problems Solved with New Directional Drilling Systems," Proceedings
of Microtunneling & Horizontal Directional Drilling Symposium,
TEC, Louisiana Tech University, November 13-15, Chapter V.
- Melsheimer, P., 1990. "Melfred Borzall's Development of
Trenchless Technology," Proceedings of Microtunneling &
Horizontal Directional Drilling Symposium, TEC, Louisiana Tech
University, November 13-15, Chapter U.
- Mercer, J.E., 1989. "Guided Microtunnelling Equipment for
Small-Diameter Utility Installation," Tunnelling and Underground
Space Technology, Volume 4, Number 2, pp. 207-213.
- Merritt, B.K., 1990. "Geotechnical Considerations for the
Microtunneling Alternative," Proceedings of Microtunneling
& Horizontal Directional Drilling Symposium, TEC, Louisiana
Tech University, November 13-15, Chapter C.
- Merritt, B.K., A. Crisci, and G.H. Klein, 1991. "Houston
Pipe Jacking - Large and Small," Proceedings of Rapid Excavation
and Tunneling Conference, SME, Chapter 22, June, pp. 391-407.
|
- Miller, P., 1995. "Twin Crossings in the Peach State,"
Trenchless Technology, June, pp. 44-46.
- Miller, R.J., 1993a. "Subsurface Exploration in Support
of Trenchless Technology," Proceedings of Trenchless Technology:
An Advanced Technical Seminar, Trenchless Technology Center, Louisiana
Tech University, January, pp. 343-352.
- Miller, R.J., 1993b. "Tunnelvision - Subsurface Exploration
Technology," Proceedings of North American No-Dig '93, NASTT,
San Jose, May, Paper B2.
- Milligan, G. and P. Norris, 1996. "Pipe Jacking Research
Results and Recommendations," Pipe Jacking Association, London,
55p.
- Mishan, E.J., 1976. Cost-Benefit Analysis, Praeger Publishers,
New York, 454 p.
- Miyazaki, K, G. Chen, F. Yamamoto, and K. Horii, 1998. "Air
Transport of Spoil for Microtunnelling," No-Dig International,
Vol. 9, No. 8, August, p. 18.
- Miyoshi, M., H. Miyazaki, and K. Fujita, 1979. "Shield-Driven
Tunnel Enlargement by Pipe-Roof Method for Subway Station Construction,"
Proceedings of Rapid Excavation and Tunneling Conference, SME,
June, pp. 416-429.
- Mohring, K., 1992. "Contributions of the Contract Placing-Authority
to the Economic Efficiency of Microtunnelling Technology,"
Microtunneling, Balkema, Rotterdam, April, pp. 79-89.
- Mohring, H.K., 1993. "Berlin - Capital City of Microtunneling,"
No-Dig International, Vol. 4, No. 5, October, pp. 5-9.
- Morgan, C.J., 1990. "Microtunneling: A Historical Perspective
of Houston's First Microtunneling Project from the Design Engineer's
Viewpoint," Proceedings of Microtunneling & Horizontal
Directional Drilling Symposium, TEC, Louisiana Tech University,
November 13-15, Chapter A.
- Moss, A.F., 1993. "Mucking Systems for Pipe Jacking and
Microtunneling," Tunnels & Tunnelling, May, pp. 23-25.
- Munro, M., 1996. "Difficult Tunneling in Flinty Ground,"
No-Dig International, Vol. 6, No. 8, August, pp. 23-24.
|
|
|
 |
|
- Najafi, M., D.T. Iseley, N.D. Pumphrey, and H. Nishida, 1993.
"Details of Kidoh/Iseki/Carlon Research Project Conducted
at TTC," Proceedings of Trenchless Technology: An Advanced
Technical Seminar, Trenchless Technology Center, Louisiana Tech
University, January, pp. 399-432.
- Najafi, M., D.T. Iseley, N.D. Pumphrey, and H. Nishida, 1993.
"New Microtunneling Propulsion System," Proceedings
of North American No-Dig '93, NASTT, San Jose, May, Paper D1.
- Navratil, P. and D. Desrochers, 1997. "Clark Drive Sanitary
Trunk Sewer Installation - Microtunneling," Proceedings of
No-Dig ¡¥97, NASTT, Seattle, April, pp. 286-298.
|
- Nicholas, P. and A. Robinson, 1988. "Microtunneling in
Yorkshire," World Tunnelling and Subsurface Excavations,
June, pp. x.
- Nicholas, P., 1998. "Urban Super Projects ¡V Past, Present
& Future Trends," Proceedings of North American No-Dig
'98, NASTT, Albuquerque, April, Paper 3B1, pp. 188-195.
- Norris, P. and G.W.E. Milligan, 1992. "Pipe End Load Transfer
Mechanisms During Pipe Jacking," Proceedings of International
No-Dig '92, NASTT, Washington, D.C., April, Paper H3.
- Novak, A.E. and R. Singleton, 1993. "Installation of a
Raw Water Intake Line by Microtunneling," Proceedings of
North American No-Dig '93, NASTT, San Jose, May, Paper N1.
|
|
|
 |
|
- O'Donnell, H.W., 1993. "Historical Overview of the Horizontal
Directional Drilling Industry," Proceedings of Trenchless
Technology: An Advanced Technical Seminar, Trenchless Technology
Center, Louisiana Tech University, January, pp. 161-173.
- Osumi, T., 1992. "Non-Discharge Consolidation for Microtunneling,"
Proceedings of International No-Dig '92, NASTT, April, Paper H1.
- Ozdemir, L., 1995. "Comparison of Cutting Efficiencies
of Single-Disc, Multi-Disc, and Carbide Cutters for Microtunneling
Applications," No-Dig Engineering, Trenchless Technology,
Vol. 2, No. 1, March , pp. 18-23.
|
|
|
|
 |
|
- Pate, J.E., 1990. "Evaluation of the Microtunneling Construction
Process: The Contract Administrator's Perspective," Proceedings
of Microtunneling & Horizontal Directional Drilling Symposium,
TEC, Louisiana Tech University, November 13-15, Chapter D.
- Pearse, G., 1992. "Tunnel Boring Machines," World
Tunnelling, October, pp. 387-396.
- Pezzimenti, A., 1998. "Microtunnelling in Basalt Down Under,"
No-Dig International, Vol. 9, No. 9, September, pp. 16-17.
- Pigorini, B., 1996. "Microtunnel¡¦s Technology Application
in Italy," North American Tunneling '96, A.A. Balkema, April,
Volume 1, pp. 433-442.
- Pilecki, T., S.J. Klein, C.W. Joyce, and A. Hamid, 1993.
"Microtunneling/Pipe Jacking Feasibility Assessment for the
Pleasant Hill Relief Interceptor Project," Proceedings of
No-Dig 93, NASTT, May, Paper L1.
- Pipe Jacking Association, 1995a. "An Introduction to Pipe
Jacking and Microtunneling Design," Pipe Jacking Association,
London, 24p.
|
- Pipe Jacking Association, 1995b. "Guide to Best Practice
for the Installation of Pipe Jacks and Microtunnels," Pipe
Jacking Association, London, June, 77p.
- Pittard, F.J., 1990. "SlimDril Downhole Tools and Techniques,"
Proceedings of Microtunneling & Horizontal Directional Drilling
Symposium, TEC, Louisiana Tech University, November 13-15, Chapter
X.
- Poltinger, A., 1997. "High-Accuracy Guideline System for
Pipejacking Along Curved Alignments," Proceedings of No-Dig
¡¥97, NASTT, Seattle, April, pp. 462-471.
- Post, R.G., 1997. "Run Silent, Run Deep: Three Deep River
Crossings by Microtunneling in the Seattle Area," Proceedings
of No-Dig ¡¥97, NASTT, Seattle, April, pp. 299-312.
- Purcell, M.A., 1994. "Microtunnelling Design Considerations,"
No-Dig International, Vol. 5, No. 9, October, pp. 24-28.
|
|
|
 |
|
- Raines, G.L., 1996a. "Nimitz Highway Relief Sewer, A Value
Engineered Microtunnel Alternative in Honolulu, Hawaii,"
Proceedings of International No-Dig '96, NASTT, New Orleans, April,
Paper 4A-3, pp. 350-360.
- Raines, G.L., 1996b. "Nimitz Highway Relief Sewer: A Value
Engineered Microtunnel Alternative," No-Dig Engineering,
Trenchless Technology, Vol. 3, No. 3, May/June, pp. 2-6.
- Raines, G.L. and J.K. Honke, 1996. "Honolulu¡¦s Street
Relief," Civil Engineering, ASCE, Vol. 66, No. 9, September,
pp. 70-72.
- Range, R. and R. Koenning, 1992. "Use of a Modified Microtunneling
Machine for Civil Engineering Purposes," Microtunneling,
Balkema, Rotterdam, April, pp. 9-14.
- Rees, D.F., 1989. "Developments in Trenchless Technology,"
Tunnelling and Underground Space Technology, Volume 4, Number
2, pp. 201-205.
- Rhodes, G.W. and J.L. Kauschinger, 1996. "Microtunneling
Provides Structural Support for Large Tunnels With Shallow Cover,"
North American Tunneling '96, A.A. Balkema, April, Volume 1, pp.
443-449.
|
- Ringen, A. and G. Raines, 1998. "Ground Improvement for
Microtunneling/Pipe Jacking Applications," Proceedings of
North American No-Dig '98, NASTT, Albuquerque, April, Paper 4B1,
pp. 274-293.
- Robinson, A. and J. Thomson, 1998a. "Shafts for Microtunneling
and Pipe Jacking, Layout, Design, and Construction," Proceedings
of North American No-Dig '98, NASTT, Albuquerque, April, Paper
3B2, pp. 196-217.
- Robinson, A. and J. Thomson, 1998b. "Pitfalls of Shaft
Design and Construction for Microtunneling and Pipe Jacking Operation,"
No-Dig Engineering, Trenchless Technology, Vol. 5, No. 1, pp.
16-20.
- Rogers, C.D.F. and S.J.S. Yonan, 1992. "Experimental Study
of a Jacked Pipeline in Sand," Tunnels & Tunnelling,
June, pp. 35-38.
- Rybel, V., 1990. "Drilled River Crossing Sets World Record,"
Proceedings of Microtunneling & Horizontal Directional Drilling
Symposium, TEC, Louisiana Tech University, November 13-15, Chapter
N.
- Rybel, V., R.M. Norman, and L.H. Foster, 1991. "Drilled
River Crossing Sets World Record," Pipeline Crossings, ASCE,
March, pp. 13-19.
|
|
|
 |
|
- Satoh, S. S. Furuyama, Y. Murai, and T. Endoh, 1996. "Construction
of a Subway Tunnel Just Beneath a Conventional Railway by Means
of Large-Diameter Long Pipe-Roof Method," North American
Tunneling '96, A.A. Balkema, April, Volume 1, pp. 473-481.
- Schafer R., 1992. "Experience on Microtunneling in the
Halle/Leipzig Industrial Region," Microtunneling, Balkema,
Rotterdam, April, pp. 37-39.
- Schmidtler, M., 1997. "Canadian Concrete Pipe Association
Guidelines Used on Tunneling Project in Calgary, Alberta,"
Proceedings of No-Dig ¡¥97, NASTT, Seattle, April, pp. 447-454.
- Schumacher, M. and M. Ellis, 1997. "Conquering Glacial
Till in Ames, Iowa," Proceedings of No-Dig ¡¥97, NASTT, Seattle,
April, pp. 455-46.
- Schwartz, W., 1993. "38-Inch-Diameter Microtunnel at Pearl
Harbor, Hawaii," Proceedings of North American No-Dig '93,
NASTT, San Jose, May, Paper J1.
- Shah, D.D. and S.K. Jain, 1991. "Remotely Controlled Direct
Pipe Jacking Experiences in Oakwood Beach Interceptor, Staten
Island, NY," Proceedings of Rapid Excavation and Tunneling
Conference, SME, Chapter 23, June, pp. 409-433.
- Sharp, J.D. and M. Turner, 1989. "Pipe Jacking Through
Hazardous Ground in St. Helens," Tunnels & Tunnelling,
March, pp. 49-50.
- Shinbo, T., 1996. "Front Monitor Radar for Tunneling Machines,"
Proceedings of International No-Dig '96, NASTT, New Orleans, April,
Paper 7A-3, pp. 633-642.
- Short, J.F., 1991. "Parallel River Crossings by Horizontal
Drilling," Pipeline Crossings, ASCE, March, pp. 276-279.
- Singh, A., E. Girma, and J. Peel, 1992. "Rehabilitation
of RCP Interceptors Damaged by Corrosion and the 1989 Loma Prieta
Earthquake," Presented at the 65th Annual Conference of the
Water Environment Federation, September.
- Smith, M., 1992. "Houston Sewers," North American
Tunneling, September, pp. N78-N80.
- Smith, M., 1993. "Crossings Galore," World Tunnelling,
Vol. 6, No. 3, April, pp. 107-108.
- Smith, M., 1995. "NELHA Undershore Crossing," No-Dig
International, Vol. 6, No. 6, June, pp. 10-13.
- Smith, M., 1998. "Sao Paulo River Cleanup," World
Tunnelling, Vol. 11, No. 6, August, pp. 289-290.
- Smith, R.J., 1993. "Using Modern Contracting Practices
for No-Dig Projects," Proceedings of North American No-Dig
'93, NASTT, San Jose, May, Paper A1.
|
- Staheli, K., 1995. "Microtunneling in California: Using
an Enlarged Shield to Excavate Multiple Tunnel Diameters,"
Proceedings of Rapid Excavation and Tunneling Conference, SME,
Chapter 26, June, pp. 393-405.
- Staheli, K. and D. Bennett, 1996. "Results of Controlled
Field Tests of a Retrievable Microtunneling System with Reaming
Capabilities," Proceedings of International No-Dig '96, NASTT,
New Orleans, April, Paper 2A-4, pp. 184-202.
- Staheli, K. and G.E. Hermanson, 1996. "Microtunneling When,
Where, and How to Use It," Water Environment & Technology,
WEF, March, pp. 31-36.
- Staheli, K. and G.E. Hermanson, 1997. "What to Do When
Your Head Gets Stuck," Proceedings of No-Dig ¡¥97, NASTT,
Seattle, April, pp. 435-446.
- Staheli, K., D.J. Young, and S.J. Klein, 1995. "Microtunneling
Using an Innovative Oversized Shield," Proceedings of North
American No-Dig '95, NASTT, Toronto, May, Paper 1A-2.
- Stangl, G.A., 1990. "Historical Development of Mini-Directional
Horizontal Boring Methods," Proceedings of Microtunneling
& Horizontal Directional Drilling Symposium, TEC, Louisiana
Tech University, November 13-15, Chapter P.
- Stein, D., K. Mollers, and R. Bielecki, 1989. Microtunneling:
Installation and Renewal of Nonman-Size Supply and Sewerage Lines
by the Trenchless Construction Method, Ernst & Sohn, Berlin,
352p.
- Steinbock, W., 1992. "The use of Slurry-Transport Machines
in the Ruhr Mining District," Microtunneling, Balkema, Rotterdam,
April, pp. 41-46.
- Stuva, A.H., 1992. "Trenchless Construction - Ecological
and Economic Advantages," Proceedings of International No-Dig
'92, NASTT, April, Paper D1.
- Sugden, R. and A. Williams, 1978. The Principles of Practical
Cost-Benefit Analysis, Oxford University Press, 275 p.
- Sulinski, S.J., 1972. "The Jacking Method in Tunnel Construction,"
Proceedings of Rapid Excavation and Tunneling Conference, AIME,
Chapter 54, Vol. 2, June, pp. 983-995.
- Swallow, W., T. Monroe, and M. Giandoni, 1998. "Case Studies
for Five City of San Diego Microtunneling Projects ¡V Moving Up
the Learning Curve to Provide Efficient Microtunnel Design Projects,"
Proceedings of North American No-Dig '98, NASTT, Albuquerque,
April, Paper 4B3, pp. 321-330.
|
|
|
 |
|
- Tanwani, R., 1996. "Pipe Jacking:
An Overview and Case Study," No-Dig Engineering, Trenchless
Technology, Vol. 3, No. 2, March-April, pp. 22-24.
- Tarkoy, P.J., 1994. "Case Histories in Trenchless Excavation,"
No-Dig Engineering, Trenchless Technology, Vol. 1, No. 1, June,
pp. 17-21.
- Taylor, N., 1993. "Mapping the Underworld - Buried Utilities
in 3D," Proceedings of North American No-Dig '93, NASTT,
San Jose, May, Paper Q1.
- Thomson, J., 1984a. "Pipe Jacking Through Water at Olten,"
Tunnels & Tunnelling: Small-bore Tunnelling and Pipe Jacking
Supplement, October, p. 30.
- Thomson, J., 1984b. "Microtunnelling - Mini Moles for Sub-900
mm," Tunnels & Tunnelling: Small-bore Tunnelling and
Pipe Jacking Supplement, October, pp. 31-33.
- Thomson, J., 1991a. "Trenchless Technology Developments
and Their Application to Pipeline Crossings," Pipeline Crossings,
ASCE, March, pp. 280-295.
|
- Thomson, J., 1991b. "The Potential for Microtunneling in
North America," Proceedings of North America No-Dig '91,
NASTT, May, Paper 4A.
- Thomson, J., 1994. Pipejacking and Microtunneling, Chapman &
Hall, New York, 238 p.
- Toepfer, A.C., 1992. "Introduction to the ATV DIN 18 319
'Pipe Jacking Operations' of the VOB/C," Microtunneling,
Balkema, Rotterdam, April, pp. 31-35.
- Tubbs, C.L., 1993. "Microtunneling: A Houston Contractor's
Perspective," Proceedings of Trenchless Technology: An Advanced
Technical Seminar, Trenchless Technology Center, Louisiana Tech
University, January, pp. 249-257.
- Turkopp, R.C., 1990. "Benefits of Hobas Pipes in Jacking
and Other Applications," Proceedings of Microtunneling &
Horizontal Directional Drilling Symposium, TEC, Louisiana Tech
University, November 13-15, Chapter J.
|
|
|
 |
|
- Uffmann, H.P., 1984. "Reducing Pipe Jacking Costs,"
Tunnels & Tunneling: Small-bore Tunnelling and Pipe Jacking
Supplement, October, p. 37.
- Uffmann, H.P., 1998. "Twelve Years of Microtunnelling,"
No-Dig International, Vol. 9, No. 10, October, pp. 22-23.
- Underground Technology Research Council, 1991. "Avoiding
and Resolving Disputes in Underground Construction," 2nd
Ed., ASCE, 82p.
- United States Department of Labor, 1993. "Workplace Injuries
and Illnesses in 1992," News, Bureau of Labor Statistics,
USDL-93-553, December 15, 12p.
|
- Uno, H. and A. Takemoto, 1996. "The Development of a Shield
Machine Requiring No Reception Shaft: A Pipejacking Method Enabling
Shield Withdrawal and Retrieval at the Starting Shaft," Proceedings
of International No-Dig '96, NASTT, New Orleans, April, Paper
7A-1, pp. 589-617.
- U.S. National Committee on Tunneling Technology, 1989. "Micro-
and Small-Diameter Tunneling: The U.S. Perspective," Tunnelling
and Underground Space Technology, Volume 4, Number 2, pp. 193-199.
|
|
|
 |
|
- Van Meter, B., 1990. "Microtunneling
Methods for Trenchless Utility Installations," Proceedings
of Microtunneling & Horizontal Directional Drilling Symposium,
TEC, Louisiana Tech University, November 13-15, Chapter G.
- Van Meter, B., 1991. "Microtunneling Methods for Constructing
Pipe Arch Tunnels," Proceedings of North America No-Dig '91,
NASTT, May, Paper 7B.
- Vert, K., 1998. "Big Tunnels from Little Tunnels,"
No-Dig International, Vol. 9, No. 5, May, pp. 16-18.
|
- Vickridge, I., D.J. Ling, and G.F. Read, 1992. "Evaluating
the Social Costs and Setting the Charges for Road Space Occupation,"
Proceedings of International No-Dig '92, NASTT, April, Paper B2.
- Vipulanandan, C., J.H. McGillis, and M.H. Bruce, 1998. "Record
Length Microtunnelling Drive Using Vitrified Clay Pipe,"
No-Dig International, Vol. 9, No. 9, September, pp. 34-35.
|
|
|
 |
|
- Wagner, T., 1990. "Sharewell Guidance Systems," Proceedings
of Microtunneling & Horizontal Directional Drilling Symposium,
TEC, Louisiana Tech University, November 13-15, Chapter W.
- Wallis, S., 1992a. "Micro Assistance for Macro Undertaking
in Atlanta" Tunnels & Tunnelling, January, pp. 39-42.
- Wallis, S., 1992b. "Microtunneling - Crisis or Consolidation?"
Tunnels & Tunnelling, July, pp. 39-42.
- Wallis, S., 1993a. "San Diego City Goes Trenchless,"
No-Dig International, Vol. 4, No. 3, June, pp. 23-25.
- Wallis, S., 1993b. "Micro Manages Rail Underpass Maze,"
No-Dig International, Vol. 4, No. 4, August, pp. 33-36.
- Wallis, S., 1993c. "U.S. Micro Trials," No-Dig International,
Vol. 4, No. 5, October, pp. 16-20.
- Wallis, S., 1994. "Steep Driving in Seattle," No-Dig
International, Vol. 5, No. 3, April, pp. 30-31.
- Wallis, S., 1995a. "Pipejacking Blockbuster," No-Dig
International, Vol. 6, No. 3, March, pp. 21-23.
- Wallis, S., 1995b. "Seattle Specifies Microtunneling,"
No-Dig International - Supplement, Vol. 6, No. 4, April, pp. N6-N10.
|
- Wallis, S., 1995c. "Microtunneling Under Active Runways
at JFK Airport," Trenchless Technology, Vol. 6, No. 5, May,
pp. 40-41.
- Wallis, S., 1998. "Commitment to Trenchless in Western
Australia," No-Dig International, Vol. 9, No. 5, May, pp.
19-23.
- Washbourne, J., 1982. "Sliding Resistance of Jacked Tunnel
Lining," Tunnels & Tunnelling, November, pp. 17-18.
- Washbourne, J., 1993. "Development and Use of Microtunnellers
in the UK," Tunnels & Tunnelling, March, pp. 69-71.
- Watson, K., 1992. "Micro Goes French," Tunnels &
Tunnelling, May, pp. 37-40.
- Westfall, D.E. and G.M. Boyce, 1996. "Small-Diameter Tunnels,"
Tunnel Engineering Handbook, Edited by J.O. Bickel, T.R. Kuesel,
and E.H. King, Chapter 16, Chapman & Hall, New York, pp. 311-319.
- White, H., B. Wilkinson, and R. Dew, 1991. "Code of Practice
for Microtunnelling," 2nd. Ed., Prepared for Yorkshire Water
Plc., November, 20p.
- Whitman, E.J. and M. Overton, 1992. "Trenchless Sewer Rehabilitation
in Amiens, France," Presented at the 65th Annual Conference
of the Water Environment Federation, September.
|
|
|
 |
|
- Zollman, P.M., 1984. "Guidance Systems for Small-bore Tunnelling,"
Tunnels & Tunneling: Small-bore Tunnelling and Pipe Jacking
Supplement, October, pp. 42-43.
|
|
|