• Abbott, D.G., 1996. "The Utilization of Microtunneling to Install Underground Pipes and Tunnels in Hard Rock," North American Tunneling '96, A.A. Balkema, April, Volume 1, pp. 3-9.
  • Abramson, L.W., M.E. Fowler, and G.M. Boyce, 1996. "Santa Cruz Landfill Water Bypass Tunnel," North American Tunneling '96, A.A. Balkema, April, Volume 1, pp. 17-25.
  • Allen, M.E., 1981. "Pipe Jacking Techniques for Small Soft Ground Tunnels," Proceedings of Rapid Excavation and Tunneling Conference, SME, May, pp. 289-306.
  • Almeida, A.V., 1992a. "Trenchless Technology: A User Perceptive," Proceedings of International No-Dig '92, NASTT, April, Paper J1.
  • Almeida, A.V., 1992b. "Dallas Goes Trenchless," Civil Engineering, ASCE, September, pp. 71-73.
  • Almeida, A.V. and D. Diehl, 1993. "Dallas Goes Trenchless," Proceedings North American No-Dig '93, NASTT, San Jose, May, Paper J2.
  • Anderson, V.W., 1990. "The Prefab Tunnel," Civil Engineering, ASCE, January, pp. 64-65.
  • Andrews, W., 1982. "Pipes Give European Tunnellers a Jack-Up," Tunnels & Tunnelling, January-February, pp. 20-21.
  • Argent, M.E., D.A. Pecknold, and R.M. HajAli, 1995. "Trenchless Installation of Steel Pipe Without Field Welding," Proceedings of North American No-Dig '95, NASTT, Toronto, May, Paper 5A-1.
  • ASCE, 1996. Pipeline Crossings, Manuals and Report on Engineering Practice No. 89, June, 133p.
  • ASTM, 1998. ASTM Standards Related to Trenchless Technology, ASTM, December, 538p.
  • Atalah, A., 1996. "Design of Microtunneling and Jacking Pipe," Proceedings of Pipeline Crossings 1996, ASCE, June, pp. 395-402.
  • Atalah, A., 1997. "Status of the North American Microtunneling Industry: History and Outlook," No-Dig Engineering, Trenchless Technology, Vol. 4, No. 3, May/June, pp. 12-16.
  • Atalah, A.L., D. Bennett, and D.T. Iseley, 1994. "Estimating The Required Jacking Force," Proceedings of North American No-Dig '94, NASTT, Dallas, April, Paper D2.
  • Atalah, A. and P. Hadala, 1996a. "Microtunneling Database for the USA and Canada," No-Dig Engineering, Trenchless Technology, Vol. 3, No. 3, May/June, pp. 18-20.
  • Atalah, A. and P. Hadala, 1996b. "Microtunneling Database for the USA and Canada from 1984 to 1995, " Proceedings of Pipeline Crossings 1996, ASCE, June, pp. 332-339.
  • Atalah, A.L. and D.T. Iseley, 1991. "Pipe Arch Horizontal Drift Method for MARTA's Transit Extension Under I-285," Proceedings of Rapid Excavation and Tunneling Conference, SME, Chapter 24, June, pp. 435-453.
  • Atkin, R. and A. Newman, 1984. "Crunchingmole Eats Gateshead Sewer," Tunnels & Tunnelling: Small-bore Tunnelling and Pipe Jacking Supplement, October, pp. 16-17.
 
 
  • Babendererde, S., 1991. "Long Distance Pipe Jacking in Sayreville, New Jersey," Proceedings of Rapid Excavation and Tunneling Conference, SME, Chapter 21, June, pp. 379-389.
  • Balasubramaniam, B. and C. DiFrancesco, 1996. "Slurry Shield Tunneling in siltstones and Cobble Stones: Australian Experience," Proceedings of International No-Dig '96, NASTT, New Orleans, April, Paper 3A-1, pp. 250-270.
  • Barbera, L.J., 1984. "Auger of a Bright Future," Tunnels & Tunnelling: Small-bore Tunnelling and Pipe Jacking Supplement, October, p. 39.
  • Barbera, L.J., D.T. Iseley, and R. Tanwani, 1993. "Historical Development of Trenchless Construction Methods and Equipment in the United States," Proceedings of Trenchless Technology: An Advanced Technical Seminar, Trenchless Technology Center, Louisiana Tech University, January, pp. 139-159.
  • Barsoom, J., 1993. "Denver's Experience in Trenchless Technology," Proceedings of Trenchless Technology: An Advanced Technical Seminar, Trenchless Technology Center, Louisiana Tech University, January, pp. 45-52.
  • Bateman, G., 1998. "Monitoring Ground Movement to Control Microtunnelling Operations," Proceedings of the 2nd Annual Asia Tunnelling Summit, Kuala Lumpur.
  • Batta, J., J. Harris, and M. Giandoni, 1998. "Appropriate Trenchless Technologies for the Successful Completion of a Major Interceptor Sewer Construction project, the City of San Diego¡¦s North Mission Valley Interceptor Sewer," Proceedings of North American No-Dig '98, NASTT, Albuquerque, April, Paper 2B1, pp. 104-110.
  • Becker, C., 1992. "The Extension of the Limits of Application of Remote Controlled Microtunnelling Machines," Microtunneling, Balkema, Rotterdam, April, pp. 67-69.
  • Becker, W., 1992. "Microtunneling Projects in Berlin and the New German Provinces," Microtunneling, Balkema, Rotterdam, April, pp. 59-65.
  • Bennett, D., 1993. "Microtunneling Tests at WES: Construction of Test Facility," Proceedings of North American No-Dig '93, NASTT, San Jose, May, Paper A2.
  • Bennett, D., L. Guice, S. Khan, and K. Staheli, 1995. Guidelines for Trenchless Technology: Cured-in-Place Pipe (CIPP), Fold-and Formed Pipe (FFP), Mini-Horizontal Directional Drilling (Mini-HDD), and Microtunneling, U.S. Army Corps of Engineers, Final Report CPAR-GL-95-2, September, 173p.
  • Bennett, D., C. Norris, and D.T. Iseley, 1993. "Microtunneling: Preliminary Results from Testing Performed Under the CPAR Program," Proceedings of Rapid Excavation and Tunneling Conference, SME, June, pp. 109-127.
  • Bennett, D. and K. Staheli, 1995. "Case Study: Retrievability and Reaming Capabilities Tested in Third WES Microtunneling Test," No-Dig Engineering, Trenchless Technology, Vol. 2, No. 1, March, pp. 8-13.
  • Bennett, D. and P.A. Taylor, 1993. "Construction of Microtunneling Test Facility at WES and Preliminary Test Results," Proceedings of Trenchless Technology: An Advanced Technical Seminar, Trenchless Technology Center, Louisiana Tech University, January, pp. 289-327.
  • Berosch, M. and C. Angot, 1992. "Social Cost and Pipelaying: A View of the Situation in France," Proceedings of International No-Dig '92, NASTT, April, Paper D3.
  • Beyert, J., 1992. "Trends and Prospects of Microtunneling in the Federal Republic of Germany," Microtunneling, Balkema, Rotterdam, April, pp. 5-7.
  • Biggart, A.R., 1979. "Slurry Face Machine Tunnelling," Proceedings of Rapid Excavation and Tunneling Conference, SME, June, pp. 497-520.
  • Bloomfield, T.D., 1994. "Polymer Concrete Pipes," No-Dig International, Vol. 5, No. 9, October, pp. 14-16.
  • Bloomfield, T.D., 1995. "Sewers and Manholes with Polymer," No-Dig Engineering, Trenchless Technology, Vol. 2, No. 2, Summer, pp. 14-17.
  • Boyce, G.M., 1992. "To Dig or Not to Dig - Microtunneling Is Answer to Underground Problems," California Consulting Engineer and Land Surveyor, Vol. 5, No. 4, Winter, pp. 12-13.
  • Boyce, G.M., 1995. "Geotechnical Considerations for Microtunneling," Proceedings of ISDT Annual Conference, Las Vegas, April, pp. x.
  • Boyce, G.M., 1997a. "Installation of a 30-Inch Diameter Ductbank Under Runway 18/36," Proceedings of No-Dig ¡¥97, NASTT, Seattle, April, pp. 127-137.
  • Boyce, G.M., 1997b. "Incorporating Microtunnels into the Design of Pipelines," Proceedings of Trenchless Pipeline Projects: Practical Applications, ASCE, Boston, June, pp. 19-26.
  • Boyce, G.M. and L.W. Abramson, 1993. "Microtunneling Design Documents," Proceedings of North American No-Dig '93, NASTT, San Jose, May, Paper B1.
  • Boyce, G.M. and E.M. Bried, 1994a. "Benefit-Cost Analysis of Microtunneling in an Urban Area," Proceedings of North American No-Dig '94, NASTT, Dallas, April, Paper A1.
  • Boyce, G.M. and E.M. Bried, 1994b. "Estimating the Social Cost Savings of Trenchless Techniques," No-Dig Engineering, Trenchless Technology, Vol. 1, No. 2, December, pp. 2-5.
  • Boyce, G.M. and E.M. Bried, 1998. "Social Cost Accounting for Trenchless Projects," Proceedings of North American No-Dig '98, NASTT, Albuquerque, April, pp. 2-12.
  • Boyce, G.M. and T.R. Coss, 1997. "A 10-Year Review of Microtunneling in North America," Proceedings of the 13th Rapid Excavation and Tunneling Conference, SME-AIME, Las Vegas, June, pp. 779-795.
  • Boyce, G.M., M.L. Fong, and L.W. Abramson, 1995. "Microtunneling & Landfills - An Ideal Combination," Proceedings of North American No-Dig '95, NASTT, Toronto, May, Paper 5C-2.
  • Boyce, G.M. and W.W.S. Gray, 1996. "A User¡¦s Guide of Pipe," Proceedings of International No-Dig '96, NASTT, New Orleans, April, Paper 6A-2, pp. 520-532.
  • Brinton, R.K., 1990. "A Contractor's Experience in the Development and Application of Mini-Directional Drilling," Proceedings of Microtunneling & Horizontal Directional Drilling Symposium, TEC, Louisiana Tech University, November 13-15, Chapter R.
  • Bristow N., 1993. "A Variable Diameter Microtunneling System," Proceedings of Trenchless Technology: An Advanced Technical Seminar, Trenchless Technology Center, Louisiana Tech University, January, pp. 329-334.
  • Bristow N., 1994. "Microtunneling Using an Upsizing Reamer," Proceedings of North American No-Dig '94, NASTT, Dallas, April, Paper E1.
  • Brusey, W., 1993. "Microtunneling Electrical Ductbanks at JFK Airport," Proceedings of North American No-Dig '93, NASTT, San Jose, May, Paper L2.
  • Brusey, W., 1998. "Utility installation Under Active Operational Facilities at Major International Airport," Proceedings of North American No-Dig '98, NASTT, Albuquerque, April, Paper 4B2, pp. 294-320.
  • Budhu, G. and D.T. Iseley, 1994. "The Economics of Trenchless Technology Versus the Traditional Cut and Fill in High-Activity Urban Corridors - A Research Concept in a Real World Environment," Proceedings of North American No-Dig '94, NASTT, Dallas, April, Paper A2.
 
 
  • Carpenter, R.R. and R. Croxton, 1995. "The Development and Installation of Ductile Iron Microtunneling Pipe," No-Dig Engineering, Trenchless Technology, Vol. 2, No. 3, Fall, pp. 7-12.
  • Carpenter, R.R. and R.C. Conner, 1996. "Ductile Iron Microtunneling Pipe, Non-Traditional Installation Applications," Proceedings of Pipeline Crossings 1996, ASCE, June, pp. 312-321.
  • Casey, E.F., 1974. "Objectives of UCRC Commission on Mini-Tunnels," Proceedings of Rapid Excavation and Tunneling Conference, SME, June, pp. 263-264.
  • CB&E Feature, 1992. "Pre-Spiling Technique Speeds Soft Ground Tunneling," California Builder & Engineer, December 21, pp. 8-12.
  • Chapman, D.N. and C.D.F. Rogers, 1996. "Understanding and Predicting Ground Behaviour associated with Trenchless Operations," Proceedings of International No-Dig '96, NASTT, New Orleans, April, Paper 6A-1, pp. 503-518.
  • Cherrington, M., 1990. "The History of River Crossings by Horizontal Directional Drilling," Proceedings of Microtunneling & Horizontal Directional Drilling Symposium, TEC, Louisiana Tech University, November 13-15, Chapter M.
  • Clarke, I., 1991. "Mannheim By-Pass Connection," World Tunnelling, October, pp. 315-317.
  • Clarke, I., 1992. "Micro Utilisation on Green Field Development," No-Dig International, Vol. 3, No. 6, December, pp. 5-8.
  • Clarke, I., 1993. "Leading the Way in the Americas," No-Dig International, Vol. 4, No. 2, April, pp. N4-N7.
  • Clarke, I., 1994a "West Coast Innovation," No-Dig America - Supplement, Vol. 5, No. 3, April, pp. 22-25.
  • Clarke, I., 1994b. "Remote-Control Assists Operation Seaclean," No-Dig International, Vol. 5, No. 11, December, pp. 6-8.
  • Clarke, I., 1994c. "New Sewers For Edmonton," No-Dig International, Vol. 5, No. 11, December, pp. 17-19.
  • Clarke, I., 1994d. "Heathrow Taxiway Crossing," No-Dig International, Vol. 5, No. 11, December, pp. 20-22.
  • Clarke, I., 1996a. "Pleasant Hill Tests New Machine Design," No-Dig International, Vol. 7, No. 2, February, pp. 13-14.
  • Clarke, I., 1996b. "Tough Times in Thurrock," No-Dig International, Vol. 7, No. 5, May, pp. 6-9.
  • Clarke, I., 1997. "Innovative Boring for Cape Girardeau Resewering," No-Dig America Supplement to No-Dig International, Vol. 8, No. 4, April.
  • Clarke, I., 1998a. "Long Distance Pipejacking," No-Dig International, Vol. 9, No. 8, August, pp. 12-13.
  • Clarke, I., 1998b. "Cardiff Bay Clean Up," No-Dig International, Vol. 9, No. 9, September, pp. 29-32.
  • Coleman, D.J., R.H. Davidson, and F. Bandoni, 1995. "Environmentally Appropriate Methods of Sewer Construction," Proceedings of North American No-Dig '95, NASTT, Toronto, May, Paper 5C-1.
  • Coller, P.J., 1990. "The Iseki Poly-Tech Story," Proceedings of Microtunneling & Horizontal Directional Drilling Symposium, TEC, Louisiana Tech University, November 13-15, Chapter H.
  • Coller, P.J., 1992. "Micro and Small Diameter Tunneling," Proceedings of International No-Dig '92, NASTT, Washington, D.C., April, Paper F1.
  • Coller, P.J., 1993a. "Overview of Microtunneling Techniques," Proceedings of Trenchless Technology: An Advanced Technical Seminar, Trenchless Technology Center, Louisiana Tech University, January, pp. 237-247.
  • Coller, P.J., 1993b. "New Developments in Muckless Microtunneling and Installation," Proceedings of North American No-Dig '93, NASTT, San Jose, May, Paper D2.
  • Coller, P.J., K. Staheli, D. Bennett, and R. Post, 1996a. "A Review of Jacking Forces by Both Theoretical and Empirical Methods as Compared with 20 Years of Practical Experience," Proceedings of International No-Dig '96, NASTT, New Orleans, April, Paper 2A-1, pp. 126-150.
  • Coller, P.J., K. Staheli, D. Bennett, and R. Post, 1996b. "Review of Jacking Forces in Theory and Practice, Part I," No-Dig Engineering, Trenchless Technology, Vol. 3, No. 5, September/October, pp. 17-23.
  • Coller, P.J., K. Staheli, D. Bennett, and R. Post, 1996c. "Review of Jacking forces in Theory and Practice, Part II," No-Dig Engineering, Trenchless Technology, Vol. 3, No. 6, November/December, pp. 16-20.
  • Coluccio, F. and D.G. Abbott, 1995. "Cutting Through the Challenges of a Long Drive," Proceedings of Rapid Excavation and Tunneling Conference, SME, Chapter 24, June, pp. 337-381.
  • Crowder, W.T., 1993. "Underwater Recovery of Microtunneling Equipment," Proceedings of Trenchless Technology: An Advanced Technical Seminar, Trenchless Technology Center, Louisiana Tech University, January, pp. 391-397.
  • Cruz, E., Jr., 1992. "Manholes and Microtunneling," Civil Engineering, ASCE, December, pp. 52-55.
  • Cruz, E., 1993. "Microtunneling Under Difficult Conditions in New York City," Proceedings of Trenchless Technology: An Advanced Technical Seminar, Trenchless Technology Center, Louisiana Tech University, January, pp. 383-390.
  • Currie, R., C. Schumacher, and E. Thornton, 1993. "Microtunneling Replaces Open Trench for Suspended Sewer Project," Proceedings of North American No-Dig '93, NASTT, San Jose, May, Paper N2.
  • Cusack, J.J., 1996. "Trenchless Relocations of existing Utilities for the Central Artery/Third Harbor Tunnel Project," Proceedings of International No-Dig '96, NASTT, New Orleans, April, Paper 4A-2, pp. 339-348.
 
 
  • Darling, P., 1992. "Brentford Sewer Relieves Underground Water Congestion," Tunnels & Tunnelling, December, pp. 47-51.
  • Darling, P., 1993a. "Jacking Fibreglass in New York," Tunnels & Tunnelling, April, pp. 18-20.
  • Darling, P., 1993b. "Jacking Under Singapore's Busiest Street," Pacific Rim Supplement to Tunnels & Tunnelling, Summer, pp. 19-23.
  • Darwin, M., 1992. "Common Trenchless Techniques," Tunnels & Tunnelling, June, pp. 49-50.
  • Donaldson, D.R., 1992. "Two Decades of Tunnelling," World Tunnelling, November, pp. 431-433.
 
 
  • Ensor, W.D., E.P. Skipper, E.M. Plucinski, and P.S. Fortin, 1991. "Horizontal Directionally Controlled Drill Crossing at the Elizabeth River, Southern River," Pipeline Crossings, ASCE, March, pp. 20-33.
  • Essex, R.J., 1993. "Subsurface Exploration Considerations for Microtunneling/Pipe Jacking Projects," Proceedings of Trenchless Technology: An Advanced Technical Seminar, Trenchless Technology Center, Louisiana Tech University, January, pp. 275-288.
 
 
 
  • Federick, R., 1995a. "State of Hawaii's Deep Water Suction Intake Tunnels by Microtunneling," Proceedings of North American No-Dig '95, NASTT, Toronto, May, Paper 6A-1.
  • Fedrick, R.M., 1995b. "State of Hawaii¡¦s Deep Water Suction Intake Tunnels by Microtunneling," Proceedings of Rapid Excavation and Tunneling Conference, SME, Chapter 25, June, pp. 383-392.
  • Firmin, J.A. and P.J. Miller, 1990. "Horizontal Directional Drilling: The Process and Product," Proceedings of Microtunneling & Horizontal Directional Drilling Symposium, TEC, Louisiana Tech University, November 13-15, Chapter S.
  • Friant, J.E. and D.G. Abbott, 1994. "Developments in Hard Rock Microtunneling," Proceedings of North American No-Dig '94, NASTT, Dallas, April, Paper E2.
  • Friant, J.E. and L. Ozdemir, 1994. "Development of the High Thrust Mini-Disc Cutter for Microtunneling Applications," No-Dig Engineering, Trenchless Technology, Vol. 1, No. 1, June, pp. 12-16.
  • Funkhouser, M.R., W.D. Leech, and S.S. Leius, 1993. "Microtunneling for Pre-Support of MARTA Tunnels," Proceedings of Rapid Excavation and Tunneling Conference, SME, June, pp. 963-982.
 
 
  • Garrett, R., 1992. "Refined Solution at Indianapolis," North American Tunneling, May, pp. N27-N30.
  • Garrett, R., 1995. "Method Change Eases Residents Fears," No-Dig International, Vol. 6, No. 5, May, pp. 12-14.
  • Garrett, R., 1998. "Microtunnelling ¡V Prequalifying and Partnering," No-Dig International, Vol. 9, No. 11, November, pp. 11-12.
  • Garrett, T., S. Savinov, and R, Lys, 1998. "The Equalizer: A Smart Material Approach to the Steering Problem," Proceedings of North American No-Dig '98, NASTT, Albuquerque, April, pp. 218-232.
  • Genzlinger, D.D., 1995. "Teamwork Overcomes Tunneling Difficulties," Trenchless Technology, February, pp. 34-36.
  • Gilman, B., 1995. "Historic Boston Offers a Real Challenge," Proceedings of North American No-Dig '95, NASTT, Toronto, May, Paper 1A-1.
  • Godinez, R. and K. Ensminger, 1996. "Microtunneling Versus Conventional Pipe Jacking: The Importance of Choosing the Right Method," Proceedings of International No-Dig '96, NASTT, New Orleans, April, Paper 4A-1, pp. 330-337.
  • Gokhale, S.B. and M.H. Bruce, 1997. "Comparison of Standards for Microtunneling Pipes," No-Dig Engineering, Trenchless Technology, Vol. 4, No. 3, May/June, pp. 8-10.
  • Gokhale, S.B., 1998. "Microtunnelling in Indiana," No-Dig International, Vol. 9, No. 3, March, pp. N3-N4.
 
 
  • Habibian, A. and S. Law, 1995. "Wetland Crossing of a Water Main by a Tunnel Boring Machine," No-Dig Engineering, Trenchless Technology, Vol. 2, No. 4, Winter, pp. 17-21.
  • Hair, C.W., 1990. "A Geotechnical Perspective on Trenchless Excavation," Proceedings of Microtunneling & Horizontal Directional Drilling Symposium, TEC, Louisiana Tech University, November 13-15, Chapter O.
  • Hair, C.W., 1991. "Analysis of Subsurface Pressures Involved with Directionally Controlled Horizontal Drilling," Pipeline Crossings, ASCE, March, pp. 1-12.
  • Hair, C.W., 1993. "Subsurface Conditions Affecting Horizontal Directional Drilling," Proceedings of Trenchless Technology: An Advanced Technical Seminar, Trenchless Technology Center, Louisiana Tech University, January, pp. 217-236.
  • Hair, J.D., 1993. "Design and Project Management Considerations Involved with Directionally Controlled Horizontal Drilling," Proceedings of Trenchless Technology: An Advanced Technical Seminar, Trenchless Technology Center, Louisiana Tech University, January, pp. 199-216.
  • Halderman, R., 1989. "Weekend Job (Horizontal Directional Drilling Case History)," World Tunnelling, August, pp. 328-329.
  • Hall, G.J., 1993. "Environmental Applications of Horizontal Wells," Proceedings of Trenchless Technology: An Advanced Technical Seminar, Trenchless Technology Center, Louisiana Tech University, January, pp. 353-367.
  • Hamilton, J., 1998. "Cairo Clean Up Continues," No-Dig International, Vol. 9, No. 10, October, pp. 18-19.
  • Hancher, D.E., T.D. White, and D.T. Iseley, 1989. "Construction Specifications for Highway Projects Requiring Horizontal Earth Boring and/or Pipe Jacking Techniques," Final Report, Indiana Department of Highways, JHRP Project No. C-36-672, File No. 9-11-26, July.
  • Hansen, D.E., R. Coon, and D. Russo, 1994. "Microtunneling for the Installation of an Electrical Duct Bank," Proceedings of North American No-Dig '94, NASTT, Dallas, April, Paper K1.
  • Hansen, R. and J. Druckman, 1998. "A Case Study of the Wilmette¡¦s Relief Sewer Program," Proceedings of North American No-Dig '98, NASTT, Albuquerque, April, Paper 2B2, pp. 111-129.
  • Hayes, N.F., 1992. "Microtunneling the Western Interceptor Sewer - Phase V, Newcastle Upon Tyne, England," Microtunneling, Balkema, Rotterdam, April, pp. 47-57.
  • Haynes, C., H.K. Proffit, and J.T. Brown, 1995. "Transmission Main Constructed With Microtunneling Techniques," No-Dig Engineering, Trenchless Technology, Vol. 2, No. 2, Summer, pp. 18-23.
  • Hayward, P., 1995. "Progress in Clayware," No-Dig International, Vol. 6 No.2, February, pp. 19-20.
  • Heavey, E., A.L. Larson, K. Madden, J.P. Miller, and S.C. Teel, 1994. "Microtunneling the Interurban: Solving Geotechnical and Design Concerns with Trenchless Technology in Seattle, Washington," Proceedings of North American No-Dig '94, NASTT, Dallas, April, Paper H2.
  • Henry, K.L. and D. Zoumaras, 1994. "To Microtunnel or Not to Microtunnel? The Construction of the Crown Point Trunk Sewer," Proceedings of Pipeline Conference, Phoenix, Arizona, June.
  • Herbert, J.C. and J.C. Thomson, 1992. "Trenchless Design for the South Coast Sewerage Scheme in Barbados," Proceedings of International No-Dig '92, NASTT, April, Paper J2.
  • Herrenknecht, M., 1996. "Europipe - 2,535 Meter Drivage, Entering a New dimension of Pipe-Jacking Operations," Proceedings of International No-Dig '96, NASTT, New Orleans, April, Paper 3A-2, pp. 272-277.
  • Hua, C.K., 1994. "Pipejacking in Malaysia," No-Dig International, Vol. 5, No. 10, November, pp. 6-8.
  • Husselbee, B.W. and R.M. Norman, 1992. "Environmental Benefits of Horizontally-Controlled Directional Drilling," Public Works, December, pp. 36-37.
 
 
  • Ingraffea, A.R., T.D. O'Rourke, H. Stewart, A. Barry, and C. Crossley, 1991. "Guidelines for Uncased Crossings of Highways and Railroads," Pipeline Crossings, ASCE, March, pp. 34-46.
  • Iseley, D.T., 1990. "Trenchless Excavation Construction: Microtunneling - The United States Experience," Proceedings of the International Symposium on Unique Underground Structures, USBR, Vol. 2, Chapter 92, June.
  • Iseley, D.T., 1991. "Microtunneling MARTA," Civil Engineering, ASCE, December, pp. 50-53.
  • Iseley, D.T. and S. Gokhale, 1997. "Transportation Research Board (TRB) Trenchless Methods Study," Proceedings of No-Dig ¡¥97, NASTT, Seattle, April, pp. 177-194.
  • Iseley, D.T. and R. Tanwani, 1990a. "Microtunneling Methods," Proceedings of Microtunneling & Horizontal Directional Drilling Symposium, TEC, Louisiana Tech University, November 13-15, Chapter K.
  • Iseley, D.T. and R. Tanwani, 1990b. "Directionally Controlled Methods in TEC," Proceedings of Microtunneling & Horizontal Directional Drilling Symposium, TEC, Louisiana Tech University, November 13-15, Chapter Z.
  • Iseley, D.T. and R. Tanwani, 1990c. "Social Costs of Traditional Methods of Utility Installation," Proceedings of Microtunneling & Horizontal Directional Drilling Symposium, TEC, Louisiana Tech University, November 13-15, Chapter AA.
  • Iseley, D.T. and R. Tanwani, 1992. "Trenchless Excavation Construction - Equipment and Methods Manual," Prepared for National Utility Contractors Association, Arlington, VA, January, 65p.
 
 
  • Jeyapalan, J.K., 1992. "Developments in Microtunneling Techniques for Sewer Construction," Presented at the 65th Annual Conference of the Water Environment Federation, September.
  • Jeyapalan, J.K., 1995. "Pipe-Soil Interaction Design Considerations in Microtunneling/Jacking Projects," Proceedings of North American No-Dig '95, NASTT, Toronto, May, Paper SA3.
  • Jones, M.B., 1989. "Big Future for Small Bores," World Tunnelling, April, pp. 137-154.
 
 
  • Kamber, P., 1992. "Microtunneling Through Scree and River Gravels in Switzerland," Microtunneling, Balkema, Rotterdam, April, pp. 15-17.
  • Kanari, H., N. Nagata, N. Kawaguchi, and M. Shiomi, 1996. "Effect of Stress Absorbers on Pipe Splitting During Jacking in Curves," Proceedings of International No-Dig '96, NASTT, New Orleans, April, Paper 3A-3, pp. 279-289.
  • Kanematsu, T. and H. Kusakawa, 1981. "Fully Mechanized Small Diameter Tunneling Technology," Proceedings of Rapid Excavation and Tunneling Conference, SME, May, pp. 332-341.
  • Kaoru, M., C. Gang, Y. Fujio, and H. Kiyoshi, 1998. "Air Transport of Spoil for Microtunnelling," No-Dig International, Vol. 9, No. 8, August, p. 18.
  • Kastner, R., A. Pellet, J. Ouvry, and A. Guilloux, 1996. "In-situ Monitoring of Microtunnelling," Proceedings of International No-Dig '96, NASTT, New Orleans, April, Paper 2A-3, pp. 171-182.
  • Kawarabata, Y., 1983. "Recent Advancements in Slurry Shield Tunneling," Proceedings of Rapid Excavation and Tunneling Conference, SME, June, pp. 299-317.
  • Kawata, H., T. Ueno, and M. Yamazaki, 1979. "Effective New Tunneling Method Under Railways," Proceedings of Rapid Excavation and Tunneling Conference, SME, June, pp. 430-443.
  • Kawakawi, K., Y. Nojiri, T. Takatsuka, T. Kurosawa, and Y. Harada, 1992. "Microtunnelling System Employing Fuzzy Reasoning for Directional Control," Proceedings of International No-Dig '92, NASTT, April, Paper L2.
  • Klein, S., 1991. "Geotechnical Aspects of Pipe Jacking Projects," Proceedings of Pipeline Crossings, ASCE, March, pp. 113-128.
  • Klein, S., 1993. "Planning and Design Considerations for Microtunneling/Pipe Jacking Projects," Proceedings of Trenchless Technology: An Advanced Technical Seminar, Trenchless Technology Center, Louisiana Tech University, January, pp. 260-273.
  • Klein, S.J., 1995. "Design Aspects of Microtunneling Projects," No-Dig Engineering, Trenchless Technology, Vol. 2, No. 2, Summer, pp. 9-12.
  • Klein, S., G.S. Nagle, G.L. Raines, 1996. "Important Geotechnical Considerations for Microtunneling," No-Dig Engineering, Trenchless Technology, Vol. 3, No. 4, July/August, pp. 9-12.
  • Klein, S.J., G.S. Nagle, M. Watson, and V.F. Scotti, 1997. "Evaluation of Trenchless Construction Methods for Bradshaw Interceptor Section 5A," Proceedings of No-Dig ¡¥97, NASTT, Seattle, April, pp. 313-331.
  • Kosowatz, J.J., 1992. "Microtunneling Forges Ahead," Engineering News Record, August 17, pp. 32-36.
  • Kramer, S.R. and W.J. McDonald, 1991. "Applications for Small-Diameter Horizontal Boring Equipment," Pipeline Crossings, ASCE, March, pp. 296-305.
  • Kramer, S.R., W.J. McDonald, and J.C. Thomson, 1992. An Introduction to Trenchless Technology, Van Nostrand Reinhold, New York, 223p.
  • Krzys, B.P., 1990. "American Soltau: A Worldwide Microtunneling Solution for North America," Proceedings of Microtunneling & Horizontal Directional Drilling Symposium, TEC, Louisiana Tech University, November 13-15, Chapter F.
  • Kuroiwa, M., T. Saitoh, and S. Sugimoto, 1992. "Development of a Shallow Seismic Reflection Survey for Microtunneling Method," Proceedings of International No-Dig '92, NASTT, April, Paper C2.
 
 
  • LaFaso, E., 1996. "Long-Distance Microtunneling for Gas Mains," No-Dig International, Vol. 7, No. 7, July, pp. 16-18.
  • Lamb, E., R. Lys and T.M. Garrett, 1993. "Specifying Microtunneling Jobs," Proceedings of Trenchless Technology: An Advanced Technical Seminar, Trenchless Technology Center, Louisiana Tech University, January, pp. 457-466.
  • Lees, H., 1993. "Microtunneling in the North West," No-Dig International, Vol. 4, No. 5, October, pp. 14-15.
  • Lemcke, U., 1991. "Shallow MARTA Transit Tunnels Under I-285 Utilizing Microtunneling, Horizontal Jet-Grouting and Pipe Piling," APTA Rapid Transit Conference, June, 29p.
  • Lemcke, U., 1992. "MARTA's Shallow Tunnels Under I-285; A Post-Construction Evaluation," APTA Rapid Transit Conference, June, 29p.
  • Lovet, R., 1981. "Excavation Equipment for Small Soft Ground Tunnels," Proceedings of Rapid Excavation and Tunneling Conference, SME, May, pp. 285-288.
 
 
  • Malcolm, S.R. and K.M. Brown, 1996. "Reinforced Concrete Pipe for Jacking and Microtunneling," No-Dig Engineering, Trenchless Technology, Vol. 3, No. 2, March-April, pp. 11-16.
  • Mathy, D. and T. Pilecki, 1997. "Planning and Design Considerations for Microtunneling," Proceedings of No-Dig ¡¥97, NASTT, Seattle, April, pp. 371-390.
  • Marshall, M.A. and G.W.E. Milligan, 1996. "A Case Study of an Instrumented Microtunnel in fine Sand," Proceedings of International No-Dig '96, NASTT, New Orleans, April, Paper 2A-2, pp. 152-169.
  • Matsushita, H., 1979. "Earth Pressure Balanced Shield Method," Proceedings of Rapid Excavation and Tunneling Conference, SME, June, pp. 521-529.
  • McArthur, T.L. and T.D. Sanders, 1993. "Sewer Tunnels Under Surface Obstacles," Public Works, March, pp. 72-74.
  • McBean, R., 1989. "Turning the Eye," World Tunnelling, August, pp. 325-327.
  • McKelvie, S.A., 1991. "Roadblocks to Microtunneling - The Canadian Experience," Proceedings of North America No-Dig '91, NASTT, May, Paper 4B.
  • McKelvie, S.A., 1994. "Selecting Microtunneling Pipe in Hartford," Proceedings of North American No-Dig '94, NASTT, Dallas, April, Paper H1.
  • McKenney, F.S., 1990. "Hard Rock Directional Crossings Problems Solved with New Directional Drilling Systems," Proceedings of Microtunneling & Horizontal Directional Drilling Symposium, TEC, Louisiana Tech University, November 13-15, Chapter V.
  • Melsheimer, P., 1990. "Melfred Borzall's Development of Trenchless Technology," Proceedings of Microtunneling & Horizontal Directional Drilling Symposium, TEC, Louisiana Tech University, November 13-15, Chapter U.
  • Mercer, J.E., 1989. "Guided Microtunnelling Equipment for Small-Diameter Utility Installation," Tunnelling and Underground Space Technology, Volume 4, Number 2, pp. 207-213.
  • Merritt, B.K., 1990. "Geotechnical Considerations for the Microtunneling Alternative," Proceedings of Microtunneling & Horizontal Directional Drilling Symposium, TEC, Louisiana Tech University, November 13-15, Chapter C.
  • Merritt, B.K., A. Crisci, and G.H. Klein, 1991. "Houston Pipe Jacking - Large and Small," Proceedings of Rapid Excavation and Tunneling Conference, SME, Chapter 22, June, pp. 391-407.

  • Miller, P., 1995. "Twin Crossings in the Peach State," Trenchless Technology, June, pp. 44-46.
  • Miller, R.J., 1993a. "Subsurface Exploration in Support of Trenchless Technology," Proceedings of Trenchless Technology: An Advanced Technical Seminar, Trenchless Technology Center, Louisiana Tech University, January, pp. 343-352.
  • Miller, R.J., 1993b. "Tunnelvision - Subsurface Exploration Technology," Proceedings of North American No-Dig '93, NASTT, San Jose, May, Paper B2.
  • Milligan, G. and P. Norris, 1996. "Pipe Jacking Research Results and Recommendations," Pipe Jacking Association, London, 55p.
  • Mishan, E.J., 1976. Cost-Benefit Analysis, Praeger Publishers, New York, 454 p.
  • Miyazaki, K, G. Chen, F. Yamamoto, and K. Horii, 1998. "Air Transport of Spoil for Microtunnelling," No-Dig International, Vol. 9, No. 8, August, p. 18.
  • Miyoshi, M., H. Miyazaki, and K. Fujita, 1979. "Shield-Driven Tunnel Enlargement by Pipe-Roof Method for Subway Station Construction," Proceedings of Rapid Excavation and Tunneling Conference, SME, June, pp. 416-429.
  • Mohring, K., 1992. "Contributions of the Contract Placing-Authority to the Economic Efficiency of Microtunnelling Technology," Microtunneling, Balkema, Rotterdam, April, pp. 79-89.
  • Mohring, H.K., 1993. "Berlin - Capital City of Microtunneling," No-Dig International, Vol. 4, No. 5, October, pp. 5-9.
  • Morgan, C.J., 1990. "Microtunneling: A Historical Perspective of Houston's First Microtunneling Project from the Design Engineer's Viewpoint," Proceedings of Microtunneling & Horizontal Directional Drilling Symposium, TEC, Louisiana Tech University, November 13-15, Chapter A.
  • Moss, A.F., 1993. "Mucking Systems for Pipe Jacking and Microtunneling," Tunnels & Tunnelling, May, pp. 23-25.
  • Munro, M., 1996. "Difficult Tunneling in Flinty Ground," No-Dig International, Vol. 6, No. 8, August, pp. 23-24.
 
 
  • Najafi, M., D.T. Iseley, N.D. Pumphrey, and H. Nishida, 1993. "Details of Kidoh/Iseki/Carlon Research Project Conducted at TTC," Proceedings of Trenchless Technology: An Advanced Technical Seminar, Trenchless Technology Center, Louisiana Tech University, January, pp. 399-432.
  • Najafi, M., D.T. Iseley, N.D. Pumphrey, and H. Nishida, 1993. "New Microtunneling Propulsion System," Proceedings of North American No-Dig '93, NASTT, San Jose, May, Paper D1.
  • Navratil, P. and D. Desrochers, 1997. "Clark Drive Sanitary Trunk Sewer Installation - Microtunneling," Proceedings of No-Dig ¡¥97, NASTT, Seattle, April, pp. 286-298.
  • Nicholas, P. and A. Robinson, 1988. "Microtunneling in Yorkshire," World Tunnelling and Subsurface Excavations, June, pp. x.
  • Nicholas, P., 1998. "Urban Super Projects ¡V Past, Present & Future Trends," Proceedings of North American No-Dig '98, NASTT, Albuquerque, April, Paper 3B1, pp. 188-195.
  • Norris, P. and G.W.E. Milligan, 1992. "Pipe End Load Transfer Mechanisms During Pipe Jacking," Proceedings of International No-Dig '92, NASTT, Washington, D.C., April, Paper H3.
  • Novak, A.E. and R. Singleton, 1993. "Installation of a Raw Water Intake Line by Microtunneling," Proceedings of North American No-Dig '93, NASTT, San Jose, May, Paper N1.
 
 
  • O'Donnell, H.W., 1993. "Historical Overview of the Horizontal Directional Drilling Industry," Proceedings of Trenchless Technology: An Advanced Technical Seminar, Trenchless Technology Center, Louisiana Tech University, January, pp. 161-173.
  • Osumi, T., 1992. "Non-Discharge Consolidation for Microtunneling," Proceedings of International No-Dig '92, NASTT, April, Paper H1.
  • Ozdemir, L., 1995. "Comparison of Cutting Efficiencies of Single-Disc, Multi-Disc, and Carbide Cutters for Microtunneling Applications," No-Dig Engineering, Trenchless Technology, Vol. 2, No. 1, March , pp. 18-23.
 
 
 
  • Pate, J.E., 1990. "Evaluation of the Microtunneling Construction Process: The Contract Administrator's Perspective," Proceedings of Microtunneling & Horizontal Directional Drilling Symposium, TEC, Louisiana Tech University, November 13-15, Chapter D.
  • Pearse, G., 1992. "Tunnel Boring Machines," World Tunnelling, October, pp. 387-396.
  • Pezzimenti, A., 1998. "Microtunnelling in Basalt Down Under," No-Dig International, Vol. 9, No. 9, September, pp. 16-17.
  • Pigorini, B., 1996. "Microtunnel¡¦s Technology Application in Italy," North American Tunneling '96, A.A. Balkema, April, Volume 1, pp. 433-442.
  • Pilecki, T., S.J. Klein, C.W. Joyce, and A. Hamid, 1993.
    "Microtunneling/Pipe Jacking Feasibility Assessment for the Pleasant Hill Relief Interceptor Project," Proceedings of No-Dig 93, NASTT, May, Paper L1.
  • Pipe Jacking Association, 1995a. "An Introduction to Pipe Jacking and Microtunneling Design," Pipe Jacking Association, London, 24p.
  • Pipe Jacking Association, 1995b. "Guide to Best Practice for the Installation of Pipe Jacks and Microtunnels," Pipe Jacking Association, London, June, 77p.
  • Pittard, F.J., 1990. "SlimDril Downhole Tools and Techniques," Proceedings of Microtunneling & Horizontal Directional Drilling Symposium, TEC, Louisiana Tech University, November 13-15, Chapter X.
  • Poltinger, A., 1997. "High-Accuracy Guideline System for Pipejacking Along Curved Alignments," Proceedings of No-Dig ¡¥97, NASTT, Seattle, April, pp. 462-471.
  • Post, R.G., 1997. "Run Silent, Run Deep: Three Deep River Crossings by Microtunneling in the Seattle Area," Proceedings of No-Dig ¡¥97, NASTT, Seattle, April, pp. 299-312.
  • Purcell, M.A., 1994. "Microtunnelling Design Considerations," No-Dig International, Vol. 5, No. 9, October, pp. 24-28.
 
 
  • Raines, G.L., 1996a. "Nimitz Highway Relief Sewer, A Value Engineered Microtunnel Alternative in Honolulu, Hawaii," Proceedings of International No-Dig '96, NASTT, New Orleans, April, Paper 4A-3, pp. 350-360.
  • Raines, G.L., 1996b. "Nimitz Highway Relief Sewer: A Value Engineered Microtunnel Alternative," No-Dig Engineering, Trenchless Technology, Vol. 3, No. 3, May/June, pp. 2-6.
  • Raines, G.L. and J.K. Honke, 1996. "Honolulu¡¦s Street Relief," Civil Engineering, ASCE, Vol. 66, No. 9, September, pp. 70-72.
  • Range, R. and R. Koenning, 1992. "Use of a Modified Microtunneling Machine for Civil Engineering Purposes," Microtunneling, Balkema, Rotterdam, April, pp. 9-14.
  • Rees, D.F., 1989. "Developments in Trenchless Technology," Tunnelling and Underground Space Technology, Volume 4, Number 2, pp. 201-205.
  • Rhodes, G.W. and J.L. Kauschinger, 1996. "Microtunneling Provides Structural Support for Large Tunnels With Shallow Cover," North American Tunneling '96, A.A. Balkema, April, Volume 1, pp. 443-449.
  • Ringen, A. and G. Raines, 1998. "Ground Improvement for Microtunneling/Pipe Jacking Applications," Proceedings of North American No-Dig '98, NASTT, Albuquerque, April, Paper 4B1, pp. 274-293.
  • Robinson, A. and J. Thomson, 1998a. "Shafts for Microtunneling and Pipe Jacking, Layout, Design, and Construction," Proceedings of North American No-Dig '98, NASTT, Albuquerque, April, Paper 3B2, pp. 196-217.
  • Robinson, A. and J. Thomson, 1998b. "Pitfalls of Shaft Design and Construction for Microtunneling and Pipe Jacking Operation," No-Dig Engineering, Trenchless Technology, Vol. 5, No. 1, pp. 16-20.
  • Rogers, C.D.F. and S.J.S. Yonan, 1992. "Experimental Study of a Jacked Pipeline in Sand," Tunnels & Tunnelling, June, pp. 35-38.
  • Rybel, V., 1990. "Drilled River Crossing Sets World Record," Proceedings of Microtunneling & Horizontal Directional Drilling Symposium, TEC, Louisiana Tech University, November 13-15, Chapter N.
  • Rybel, V., R.M. Norman, and L.H. Foster, 1991. "Drilled River Crossing Sets World Record," Pipeline Crossings, ASCE, March, pp. 13-19.

 
 
  • Satoh, S. S. Furuyama, Y. Murai, and T. Endoh, 1996. "Construction of a Subway Tunnel Just Beneath a Conventional Railway by Means of Large-Diameter Long Pipe-Roof Method," North American Tunneling '96, A.A. Balkema, April, Volume 1, pp. 473-481.
  • Schafer R., 1992. "Experience on Microtunneling in the Halle/Leipzig Industrial Region," Microtunneling, Balkema, Rotterdam, April, pp. 37-39.
  • Schmidtler, M., 1997. "Canadian Concrete Pipe Association Guidelines Used on Tunneling Project in Calgary, Alberta," Proceedings of No-Dig ¡¥97, NASTT, Seattle, April, pp. 447-454.
  • Schumacher, M. and M. Ellis, 1997. "Conquering Glacial Till in Ames, Iowa," Proceedings of No-Dig ¡¥97, NASTT, Seattle, April, pp. 455-46.
  • Schwartz, W., 1993. "38-Inch-Diameter Microtunnel at Pearl Harbor, Hawaii," Proceedings of North American No-Dig '93, NASTT, San Jose, May, Paper J1.
  • Shah, D.D. and S.K. Jain, 1991. "Remotely Controlled Direct Pipe Jacking Experiences in Oakwood Beach Interceptor, Staten Island, NY," Proceedings of Rapid Excavation and Tunneling Conference, SME, Chapter 23, June, pp. 409-433.
  • Sharp, J.D. and M. Turner, 1989. "Pipe Jacking Through Hazardous Ground in St. Helens," Tunnels & Tunnelling, March, pp. 49-50.
  • Shinbo, T., 1996. "Front Monitor Radar for Tunneling Machines," Proceedings of International No-Dig '96, NASTT, New Orleans, April, Paper 7A-3, pp. 633-642.
  • Short, J.F., 1991. "Parallel River Crossings by Horizontal Drilling," Pipeline Crossings, ASCE, March, pp. 276-279.
  • Singh, A., E. Girma, and J. Peel, 1992. "Rehabilitation of RCP Interceptors Damaged by Corrosion and the 1989 Loma Prieta Earthquake," Presented at the 65th Annual Conference of the Water Environment Federation, September.
  • Smith, M., 1992. "Houston Sewers," North American Tunneling, September, pp. N78-N80.
  • Smith, M., 1993. "Crossings Galore," World Tunnelling, Vol. 6, No. 3, April, pp. 107-108.
  • Smith, M., 1995. "NELHA Undershore Crossing," No-Dig International, Vol. 6, No. 6, June, pp. 10-13.
  • Smith, M., 1998. "Sao Paulo River Cleanup," World Tunnelling, Vol. 11, No. 6, August, pp. 289-290.
  • Smith, R.J., 1993. "Using Modern Contracting Practices for No-Dig Projects," Proceedings of North American No-Dig '93, NASTT, San Jose, May, Paper A1.
  • Staheli, K., 1995. "Microtunneling in California: Using an Enlarged Shield to Excavate Multiple Tunnel Diameters," Proceedings of Rapid Excavation and Tunneling Conference, SME, Chapter 26, June, pp. 393-405.
  • Staheli, K. and D. Bennett, 1996. "Results of Controlled Field Tests of a Retrievable Microtunneling System with Reaming Capabilities," Proceedings of International No-Dig '96, NASTT, New Orleans, April, Paper 2A-4, pp. 184-202.
  • Staheli, K. and G.E. Hermanson, 1996. "Microtunneling When, Where, and How to Use It," Water Environment & Technology, WEF, March, pp. 31-36.
  • Staheli, K. and G.E. Hermanson, 1997. "What to Do When Your Head Gets Stuck," Proceedings of No-Dig ¡¥97, NASTT, Seattle, April, pp. 435-446.
  • Staheli, K., D.J. Young, and S.J. Klein, 1995. "Microtunneling Using an Innovative Oversized Shield," Proceedings of North American No-Dig '95, NASTT, Toronto, May, Paper 1A-2.
  • Stangl, G.A., 1990. "Historical Development of Mini-Directional Horizontal Boring Methods," Proceedings of Microtunneling & Horizontal Directional Drilling Symposium, TEC, Louisiana Tech University, November 13-15, Chapter P.
  • Stein, D., K. Mollers, and R. Bielecki, 1989. Microtunneling: Installation and Renewal of Nonman-Size Supply and Sewerage Lines by the Trenchless Construction Method, Ernst & Sohn, Berlin, 352p.
  • Steinbock, W., 1992. "The use of Slurry-Transport Machines in the Ruhr Mining District," Microtunneling, Balkema, Rotterdam, April, pp. 41-46.
  • Stuva, A.H., 1992. "Trenchless Construction - Ecological and Economic Advantages," Proceedings of International No-Dig '92, NASTT, April, Paper D1.
  • Sugden, R. and A. Williams, 1978. The Principles of Practical Cost-Benefit Analysis, Oxford University Press, 275 p.
  • Sulinski, S.J., 1972. "The Jacking Method in Tunnel Construction," Proceedings of Rapid Excavation and Tunneling Conference, AIME, Chapter 54, Vol. 2, June, pp. 983-995.
  • Swallow, W., T. Monroe, and M. Giandoni, 1998. "Case Studies for Five City of San Diego Microtunneling Projects ¡V Moving Up the Learning Curve to Provide Efficient Microtunnel Design Projects," Proceedings of North American No-Dig '98, NASTT, Albuquerque, April, Paper 4B3, pp. 321-330.
 
 
  • Tanwani, R., 1996. "Pipe Jacking: An Overview and Case Study," No-Dig Engineering, Trenchless Technology, Vol. 3, No. 2, March-April, pp. 22-24.
  • Tarkoy, P.J., 1994. "Case Histories in Trenchless Excavation," No-Dig Engineering, Trenchless Technology, Vol. 1, No. 1, June, pp. 17-21.
  • Taylor, N., 1993. "Mapping the Underworld - Buried Utilities in 3D," Proceedings of North American No-Dig '93, NASTT, San Jose, May, Paper Q1.
  • Thomson, J., 1984a. "Pipe Jacking Through Water at Olten," Tunnels & Tunnelling: Small-bore Tunnelling and Pipe Jacking Supplement, October, p. 30.
  • Thomson, J., 1984b. "Microtunnelling - Mini Moles for Sub-900 mm," Tunnels & Tunnelling: Small-bore Tunnelling and Pipe Jacking Supplement, October, pp. 31-33.
  • Thomson, J., 1991a. "Trenchless Technology Developments and Their Application to Pipeline Crossings," Pipeline Crossings, ASCE, March, pp. 280-295.
  • Thomson, J., 1991b. "The Potential for Microtunneling in North America," Proceedings of North America No-Dig '91, NASTT, May, Paper 4A.
  • Thomson, J., 1994. Pipejacking and Microtunneling, Chapman & Hall, New York, 238 p.
  • Toepfer, A.C., 1992. "Introduction to the ATV DIN 18 319 'Pipe Jacking Operations' of the VOB/C," Microtunneling, Balkema, Rotterdam, April, pp. 31-35.
  • Tubbs, C.L., 1993. "Microtunneling: A Houston Contractor's Perspective," Proceedings of Trenchless Technology: An Advanced Technical Seminar, Trenchless Technology Center, Louisiana Tech University, January, pp. 249-257.
  • Turkopp, R.C., 1990. "Benefits of Hobas Pipes in Jacking and Other Applications," Proceedings of Microtunneling & Horizontal Directional Drilling Symposium, TEC, Louisiana Tech University, November 13-15, Chapter J.
 
 
  • Uffmann, H.P., 1984. "Reducing Pipe Jacking Costs," Tunnels & Tunneling: Small-bore Tunnelling and Pipe Jacking Supplement, October, p. 37.
  • Uffmann, H.P., 1998. "Twelve Years of Microtunnelling," No-Dig International, Vol. 9, No. 10, October, pp. 22-23.
  • Underground Technology Research Council, 1991. "Avoiding and Resolving Disputes in Underground Construction," 2nd Ed., ASCE, 82p.
  • United States Department of Labor, 1993. "Workplace Injuries and Illnesses in 1992," News, Bureau of Labor Statistics, USDL-93-553, December 15, 12p.
  • Uno, H. and A. Takemoto, 1996. "The Development of a Shield Machine Requiring No Reception Shaft: A Pipejacking Method Enabling Shield Withdrawal and Retrieval at the Starting Shaft," Proceedings of International No-Dig '96, NASTT, New Orleans, April, Paper 7A-1, pp. 589-617.
  • U.S. National Committee on Tunneling Technology, 1989. "Micro- and Small-Diameter Tunneling: The U.S. Perspective," Tunnelling and Underground Space Technology, Volume 4, Number 2, pp. 193-199.
 
 
  • Van Meter, B., 1990. "Microtunneling Methods for Trenchless Utility Installations," Proceedings of Microtunneling & Horizontal Directional Drilling Symposium, TEC, Louisiana Tech University, November 13-15, Chapter G.
  • Van Meter, B., 1991. "Microtunneling Methods for Constructing Pipe Arch Tunnels," Proceedings of North America No-Dig '91, NASTT, May, Paper 7B.
  • Vert, K., 1998. "Big Tunnels from Little Tunnels," No-Dig International, Vol. 9, No. 5, May, pp. 16-18.
  • Vickridge, I., D.J. Ling, and G.F. Read, 1992. "Evaluating the Social Costs and Setting the Charges for Road Space Occupation," Proceedings of International No-Dig '92, NASTT, April, Paper B2.
  • Vipulanandan, C., J.H. McGillis, and M.H. Bruce, 1998. "Record Length Microtunnelling Drive Using Vitrified Clay Pipe," No-Dig International, Vol. 9, No. 9, September, pp. 34-35.
 
 
  • Wagner, T., 1990. "Sharewell Guidance Systems," Proceedings of Microtunneling & Horizontal Directional Drilling Symposium, TEC, Louisiana Tech University, November 13-15, Chapter W.
  • Wallis, S., 1992a. "Micro Assistance for Macro Undertaking in Atlanta" Tunnels & Tunnelling, January, pp. 39-42.
  • Wallis, S., 1992b. "Microtunneling - Crisis or Consolidation?" Tunnels & Tunnelling, July, pp. 39-42.
  • Wallis, S., 1993a. "San Diego City Goes Trenchless," No-Dig International, Vol. 4, No. 3, June, pp. 23-25.
  • Wallis, S., 1993b. "Micro Manages Rail Underpass Maze," No-Dig International, Vol. 4, No. 4, August, pp. 33-36.
  • Wallis, S., 1993c. "U.S. Micro Trials," No-Dig International, Vol. 4, No. 5, October, pp. 16-20.
  • Wallis, S., 1994. "Steep Driving in Seattle," No-Dig International, Vol. 5, No. 3, April, pp. 30-31.
  • Wallis, S., 1995a. "Pipejacking Blockbuster," No-Dig International, Vol. 6, No. 3, March, pp. 21-23.
  • Wallis, S., 1995b. "Seattle Specifies Microtunneling," No-Dig International - Supplement, Vol. 6, No. 4, April, pp. N6-N10.
  • Wallis, S., 1995c. "Microtunneling Under Active Runways at JFK Airport," Trenchless Technology, Vol. 6, No. 5, May, pp. 40-41.
  • Wallis, S., 1998. "Commitment to Trenchless in Western Australia," No-Dig International, Vol. 9, No. 5, May, pp. 19-23.
  • Washbourne, J., 1982. "Sliding Resistance of Jacked Tunnel Lining," Tunnels & Tunnelling, November, pp. 17-18.
  • Washbourne, J., 1993. "Development and Use of Microtunnellers in the UK," Tunnels & Tunnelling, March, pp. 69-71.
  • Watson, K., 1992. "Micro Goes French," Tunnels & Tunnelling, May, pp. 37-40.
  • Westfall, D.E. and G.M. Boyce, 1996. "Small-Diameter Tunnels," Tunnel Engineering Handbook, Edited by J.O. Bickel, T.R. Kuesel, and E.H. King, Chapter 16, Chapman & Hall, New York, pp. 311-319.
  • White, H., B. Wilkinson, and R. Dew, 1991. "Code of Practice for Microtunnelling," 2nd. Ed., Prepared for Yorkshire Water Plc., November, 20p.
  • Whitman, E.J. and M. Overton, 1992. "Trenchless Sewer Rehabilitation in Amiens, France," Presented at the 65th Annual Conference of the Water Environment Federation, September.
 
 
  • Zollman, P.M., 1984. "Guidance Systems for Small-bore Tunnelling," Tunnels & Tunneling: Small-bore Tunnelling and Pipe Jacking Supplement, October, pp. 42-43.
 


Copyright © 1999-2005 chkstt.org. All Rights Reserved.